I'm LongbridgeAI, I can summarize articles.BOMESC signed a construction contract for the upper module of the Floating Production Storage and Offloading (FPSO) vessel with STS VOF, with a contract amount of 750 million to 1 billion yuan. The FPSO will be deployed in the Suriname oil field, and the main tasks include design, material procurement, and construction, with the final amount to be confirmed based on the actual work completed
According to the Zhitong Finance APP, BOMESC (603727.SH) announced that the company has signed a construction contract for the upper module of a Floating Production Storage and Offloading (FPSO) vessel with STS VOF (referred to as "STS"). Once completed, this FPSO will be deployed in the Suriname oil field. The main scope of work includes the design, material procurement, and construction of the FPSO upper module, with a contract amount ranging from RMB 750 million to 1 billion. The contract amount consists of a fixed price portion and a variable workload portion based on current estimates. The final contract amount will be determined based on the actual workload completed as confirmed by both parties at the end of the contract
