---
title: "Gansu Energy and Chemical intends to invest in the Lanzhou New Area 2×1000MW thermal power project with a static investment of 7.961 billion yuan"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/228548996.md"
description: "Gansu Energy Chemical plans to invest 7.961 billion yuan to construct a 2×1000MW thermal power project in Lanzhou New Area. The project will build efficient ultra-supercritical coal-fired generating units, along with desulfurization, denitrification facilities, and other supporting facilities. The annual power generation is expected to be 9 billion kilowatt-hours, with an annual coal consumption of 4.46 million tons. Project funding will be resolved through bank loans, investment attraction, and other means"
datetime: "2025-02-17T11:00:08.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/228548996.md)
  - [en](https://longbridge.com/en/news/228548996.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/228548996.md)
generator: "portal-rs"
---

# Gansu Energy and Chemical intends to invest in the Lanzhou New Area 2×1000MW thermal power project with a static investment of 7.961 billion yuan

According to the announcement from Gansu Energy Chemical (000552.SZ), based on the national energy construction and development strategy, coal power industry policies, and the development plans of Gansu Province and Lanzhou New Area, in order to further implement the provincial party committee and government’s decision to "strengthen the province and the city," improve resource utilization efficiency, optimize the company's industrial layout, and strengthen the coal power main business, the company plans to invest in the construction of a 2×1000MW thermal power project in Lanzhou New Area.

The project plans to build 2×1000MW high-efficiency ultra-supercritical coal-fired air-cooled generating units, with one unit per tower, simultaneously constructing desulfurization and denitrification facilities, supporting the construction of a 750kV distribution device, a dedicated coal transport railway line, an ash yard, and distributed rooftop photovoltaics, with a designed annual power generation of 9 billion kilowatt-hours and an annual coal consumption of 4.46 million tons. The project's static investment is 7.961 billion yuan, and the dynamic investment is 8.284 billion yuan. The project construction funds will be resolved through bank loans, loans from other financial institutions, attracting investment, and introducing strategic investors

### Related Stocks

- [688501.CN](https://longbridge.com/en/quote/688501.CN.md)
- [000552.CN](https://longbridge.com/en/quote/000552.CN.md)

## Related News & Research

- [Liuzhou Iron & Steel Co: Net profit plunged 79% on lower sales and higher costs, despite strong R&D and export growth](https://longbridge.com/en/news/297320057.md)
- [Fosun turns page after property writedowns, shifts focus back to growth](https://longbridge.com/en/news/297240299.md)
- [Analyst Reiterates Buy on IFN After Stronger‑Than‑Expected FY26 Results, Upgraded Outlook and Potential Upside from Pure Environmental Sale](https://longbridge.com/en/news/297101198.md)
- [Maanshan Iron & Steel reverses RMB 388.43 million inventory write-down provisions in H1 2026](https://longbridge.com/en/news/297338786.md)
- [SynAct Pharma Expands Resomelagon’s Potential With New Preclinical Inflammation Data](https://longbridge.com/en/news/297303959.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**