I'm LongbridgeAI, I can summarize articles.According to the Zhitong Finance APP, GHT announced that its holding subsidiary Beijing Easy Use Vision Technology Co., Ltd. (referred to as "Easy Use Vision") won the bid for the digital power station technical service project (infrastructure period) of the Guizhou Province Guiyang Pumped Storage Power Station, with a bid price of approximately 33.6001 million yuan and a construction period of 2,190 calendar days
According to the Zhitong Finance APP, GHT (300711.SZ) announced that its controlling subsidiary Beijing Yiyong Shidian Technology Co., Ltd. (referred to as "Yiyong Shidian") won the bid for the digital power station technology service project (infrastructure period) of the Guizhou Province Guiyang Pumped Storage Power Station, with a bid price of approximately 33.6001 million yuan and a construction period of 2,190 calendar days
