---
title: "MCST consortium is pre-qualified for the 204 million yuan desertification prevention and control project (construction)"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/237476168.md"
description: "MCST, together with Alashan Left Banner Lanma Landscape Ecological Construction Co., Ltd. and Alashan League Urban Investment Construction Engineering Co., Ltd., formed a consortium to participate in the bidding for the desertification control project in Alashan League, Inner Mongolia Autonomous Region. The project is tendered by the Alashan Left Banner Science and Technology and Forestry Grassland Bureau, and the consortium has been evaluated as the first candidate for the bid, with a proposed bid price of 204 million yuan"
datetime: "2025-04-25T01:12:02.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/237476168.md)
  - [en](https://longbridge.com/en/news/237476168.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/237476168.md)
generator: "portal-rs"
---

# MCST consortium is pre-qualified for the 204 million yuan desertification prevention and control project (construction)

According to the Zhitong Finance APP, MCST (300355.SZ) announced that the company has recently formed a consortium with Alashan Left Banner Lanma Landscape Ecological Construction Co., Ltd. and Alashan League Urban Investment Construction Engineering Co., Ltd. to jointly participate in the bidding for the "Inner Mongolia Autonomous Region Alashan League Alashan Left Banner - Three North Phase VI Menggan Border Sand Prevention and Control Desert Locking Project (Construction)." The project is tendered by the Alashan Left Banner Science and Technology and Forestry Grassland Bureau. According to the public announcement of the winning candidates for the "Inner Mongolia Autonomous Region Alashan League Alashan Left Banner - Three North Phase VI Menggan Border Sand Prevention and Control Desert Locking Project (Construction)" released by the Inner Mongolia Autonomous Region Public Resources Trading Network on April 24, 2025, the consortium where the company is located is the first winning candidate, with a proposed winning bid of 204 million yuan

### Related Stocks

- [300355.CN](https://longbridge.com/en/quote/300355.CN.md)

## Related News & Research

- [REG - KCR Residential REIT - Result of AGM](https://longbridge.com/en/news/306917206.md)
- [Mediators continue transmitting messages between Iran and US, Iran's foreign minister says](https://longbridge.com/en/news/306930073.md)
- [‘Nostradamus of AI’ burnt again as his fund suffers 65pc loss](https://longbridge.com/en/news/306920403.md)
- [Anthropic Surges Past IPO Price Intraday, May Struggle to Top $100 Before 2027](https://longbridge.com/en/news/307002766.md)
- [SoFi Technologies (SOFI), Why Is It Back In The Spotlight?](https://longbridge.com/en/news/306997550.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**