---
title: "ZHEFU Holdings: The main equipment of multiple hydropower stations in the middle reaches of the Yarlung Tsangpo River is supplied by ZHEFU Holdings and has been connected to the grid for power generation"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/251132668.md"
description: "ZHEFU stated on the interactive platform that the main equipment supplied for several hydropower stations in the middle reaches of the Yarlung Tsangpo River has successfully been connected to the grid for power generation. These hydropower stations include the Level 2 Tibet Dagu Hydropower Station, the Level 4 Zangmu Hydropower Station, and the Level 5 Gacha Hydropower Station. Currently, the Yaxia project is still in the early stages of construction, and the company has not yet confirmed relevant orders, but will actively connect based on market demand and project progress, and fulfill its information disclosure obligations"
datetime: "2025-08-01T07:48:20.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/251132668.md)
  - [en](https://longbridge.com/en/news/251132668.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/251132668.md)
---

# ZHEFU Holdings: The main equipment of multiple hydropower stations in the middle reaches of the Yarlung Tsangpo River is supplied by ZHEFU Holdings and has been connected to the grid for power generation

ZHEFU Holdings stated on the interactive platform that among the planned five-level hydropower stations in the canyon section from Sangri County to Gacha County in the middle reaches of the Yarlung Tsangpo River, the main equipment for the second-level Tibet Dagu Hydropower Station, the fourth-level Zangmu Hydropower Station, and the fifth-level Gacha Hydropower Station is supplied by ZHEFU Holdings. The aforementioned hydropower stations have all been connected to the grid for power generation. As of now, the Yaxia project is still in the early stages of construction, and the company currently has no confirmed related orders. In the future, the company will actively connect with market demand and, based on project progress and order fulfillment, will strictly fulfill its information disclosure obligations in a timely manner according to relevant regulations

### Related Stocks

- [002266.CN](https://longbridge.com/en/quote/002266.CN.md)

## Related News & Research

- [India's lifeline ferry across strategic archipelago](https://longbridge.com/en/news/286716580.md)
- [Hisense Home Appliances Deploys RMB1.81 Billion into Chongqing Trust Wealth Products](https://longbridge.com/en/news/286888326.md)
- [Energo-Pro upgrades 280 MW hydropower plant in Turkey with PV park](https://longbridge.com/en/news/287108366.md)
- [14:15 ETAn InventHelp 123Invent Client Develops Spill-Proof Drinking Cup](https://longbridge.com/en/news/286952920.md)
- [11:48 ETInventHelp Inventor Develops New Remote Control Finder (TKA-458)](https://longbridge.com/en/news/286941635.md)