longbridgelongbridge
  • Platform Features
    Features
    Investment ProductsPrivate Wealth ManagementTrading ToolsMarket Data ServicesAnalysis ToolsNews ServicesFor Developers
    Account Types
    For IndividualsFor Institutions
  • Café
longbridge
© 2026 Longbridge|Terms of ServicePrivacy Policy

The 17,000 square meter photovoltaic panel array at the No. 2 camp of the Babu Oilfield, constructed by the engineering construction company under CPEC, has officially been powered on

Zhitong
Aug 18, 2025 at 01:18 PM

CPEC's engineering construction company in the Gulf region fully utilizes natural conditions and gradually replaces high-priced diesel consumption through a "photovoltaic + diesel generator" dual system model, effectively reducing greenhouse gas and pollutant emissions while lowering costs and increasing efficiency. Recently, the company completed the electrification of a new 17,000 square meter photovoltaic panel array at the Bab oil field Camp No. 2, injecting clean energy into this desert area once again

Source: Zhitong The copyright of this article belongs to the original author/organization.

The views expressed herein are solely those of the author and do not reflect the stance of the platform. The content is intended for investment reference purposes only and shall not be considered as investment advice. Please contact us if you have any questions or suggestions regarding the content services provided by the platform.

CPEC

CPEC

600339.SH

Open

--

High

--

Low

--

Prev Close

--

P/ETTM

--

Market Cap

--

LongbridgeAI