---
title: "SAINTY MARINE: The second 1 million kilowatt unit of GuoXin ShaZhou has been put into production"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/254594086.md"
description: "The second 1 million kilowatt unit of Jiangsu Guoxin Holdings' subsidiary Jiangsu Guoxin Shazhou Power Generation Co., Ltd. was officially put into operation on August 26, 2025, completing 168 hours of full-load trial operation. This project will effectively alleviate the peak electricity tension in the Suzhou area and provide adjustment capacity for ultra-high voltage green power outside the province and new energy generation within the province, contributing to the carbon reduction optimization of Jiangsu Province's energy structure"
datetime: "2025-08-26T10:08:30.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/254594086.md)
  - [en](https://longbridge.com/en/news/254594086.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/254594086.md)
generator: "portal-rs"
---

# SAINTY MARINE: The second 1 million kilowatt unit of GuoXin ShaZhou has been put into production

Jiangsu Guoxin announced that its holding subsidiary Jiangsu Guoxin Shazhou Power Generation Co., Ltd. has completed 168 hours of full-load trial operation for its second 1 million kilowatt secondary reheating ultra-supercritical coal-fired generating unit, which will officially commence operation on August 26, 2025. The first 1 million kilowatt unit of Guoxin Shazhou was put into operation on July 8, 2025. Thus, the expansion project of the 2×1 million kilowatt units of Guoxin Shazhou has completed the "dual investment." The electricity generated by the project will mainly be consumed locally in the Suzhou area, effectively alleviating the tight situation of peak electricity demand in the region. The project follows the flexible and adaptable requirements for the construction of a new power system, with a construction of 20% of the most advanced peak shaving capacity. In addition to quickly responding to changes in grid electricity load demand, it will provide adjustment capacity space for the ultra-high voltage green electricity from outside the province and the new energy generation within the province, assisting in the carbon reduction optimization of Jiangsu Province's energy supply structure

### Related Stocks

- [002608.CN](https://longbridge.com/en/quote/002608.CN.md)

## Related News & Research

- [REG - Frontier Developmnts - Notice of FY26 Financial Results](https://longbridge.com/en/news/297272100.md)
- [RCS - Vivo Energy Limited - Notice of Meeting – 2026 Interim Results](https://longbridge.com/en/news/297161642.md)
- [08:02 ETFour Kantor & Kantor, LLP Attorneys Recognized in the 2027 Edition of The Best Lawyers in America ®](https://longbridge.com/en/news/297041639.md)
- [MRS Logistica signs R$ 300 million rail freight contract addendum with Usiminas unit MUSA](https://longbridge.com/en/news/297227987.md)
- [LB Group : Revenue up 8.15% but net profit down 39.08% amid cost pressures and major share buyback](https://longbridge.com/en/news/297034690.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**