--- title: "Ameren Corporation Announces Illinois Valley Reliability Project to Enhance Energy Infrastructure in Bureau and LaSalle Counties" description: "Ameren Corporation is launching the Illinois Valley Reliability Project, a 23-mile transmission line to improve energy reliability in Bureau and LaSalle counties. The project includes a 138-kilovolt t" type: "news" locale: "en" url: "https://longbridge.com/en/news/258130248.md" published_at: "2025-09-19T16:19:03.000Z" --- # Ameren Corporation Announces Illinois Valley Reliability Project to Enhance Energy Infrastructure in Bureau and LaSalle Counties > Ameren Corporation is launching the Illinois Valley Reliability Project, a 23-mile transmission line to improve energy reliability in Bureau and LaSalle counties. The project includes a 138-kilovolt transmission line, upgrades to the Princeton substation, and a new switching station near Peru. Community open houses for public input are scheduled for September 22 and 23, with a virtual option available from September 19 to October 3. The project aims to be operational by late 2029. Ameren Corporation’s Ameren Transmission is advancing the Illinois Valley Reliability Project, a 23-mile transmission line aimed at enhancing energy reliability and supporting local growth in Bureau and LaSalle counties. The project entails constructing a 138-kilovolt transmission line, upgrading the Princeton substation, and building a new switching station near Peru, dubbed Lima. Community members are invited to participate in a second round of open houses to provide input on proposed routes and partake in the planning process. These sessions, scheduled for September 22 and 23, offer an informal setting for residents to review potential routes and share their perspectives. A virtual open house will also be available online from September 19 to October 3. The project is slated to be operational by late 2029. More information can be found on the project website or by contacting the project hotline. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Ameren Corporation published the original content used to generate this news brief on September 19, 2025, and is solely responsible for the information contained therein. © Copyright 2025 - Public Technologies (PUBT) Original Document: here ### Related Stocks - [AEE.US - Ameren](https://longbridge.com/en/quote/AEE.US.md) ## Related News & Research | Title | Description | URL | |-------|-------------|-----| | 阿曼瑞恩公司公布 2025 财年调整后稀释每股收益为 5.03 美元,同比增长 8.6% | 阿曼瑞恩公司报告了 2025 财年的调整后摊薄每股收益为 5.03 美元,同比增长 8.6%。该公司将股息提高了 5.6%,并确认了 2026 年的每股收益指导区间为 5.25 美元至 5.45 美元。阿曼瑞恩预计 2026 年至 2030 | [Link](https://longbridge.com/en/news/275679463.md) | | “做多能源 + 做空可选消费” –当下火遍华尔街的 “配对交易组合” | 科技股主导地位动摇,能源股因油价反弹和 AI 发展的巨大能耗需求而表现强劲;分析认为做空可选消费是因为零售数据疲软、企业盈利预期差引发对消费者健康状况的担忧,且相比直接做空具有颠覆能力的科技股,做空该板块风险更可控。 | [Link](https://longbridge.com/en/news/276087906.md) | | PBF 能源|8-K:2025 财年 Q4 营收 71.4 亿美元超过预期 | | [Link](https://longbridge.com/en/news/275749250.md) | | 首批三个项目聚焦 “数据中心、原油码头、合成钻石”,美日 5500 亿美元投资基金即将启动 | 美日协议首批三个项目分别为:软银主导的数据中心基础设施项目、墨西哥湾深海原油码头项目,以及用于半导体的合成钻石项目。这些项目符合去年特朗普访日期间确定的投资框架,该框架涵盖能源、人工智能和关键矿产等领域,涉及软银、西屋电气和东芝等企业。根据 | [Link](https://longbridge.com/en/news/275719286.md) | | 引爆美股 “黑色星期四” 的导火索,是这家市值 600 万美元的 “小公司” | 前卡拉 OK 设备公司 Algorhythm Holdings 声称其 AI 物流平台可助客户在不增人手情况下将货运量扩大 300%-400%,引发 AI 颠覆传统行业担忧:周四物流板块重挫,罗素 3000 卡车运输指数跌 6.6%,CH | [Link](https://longbridge.com/en/news/275829680.md) | --- > **Disclaimer**: This article is for reference only and does not constitute any investment advice.