--- title: "LXTG plans to invest 237 million yuan to construct an energy-saving upgrade and transformation project for carbon black tail gas waste heat power generation units" type: "News" locale: "en" url: "https://longbridge.com/en/news/258900079.md" description: "LXTG plans to invest 237 million yuan for energy-saving upgrades and renovations of carbon black flue gas waste heat power generation units, with a construction period of 11 months. The project is divided into two phases and aims to improve the energy utilization efficiency of the existing power generation units, with an expected increase of 31%. The project will adopt self-generated and self-used electricity as well as surplus electricity grid connection, and will include the construction of main plant buildings, boilers, steam turbines, and other facilities" datetime: "2025-09-25T13:18:04.000Z" locales: - [zh-CN](https://longbridge.com/zh-CN/news/258900079.md) - [en](https://longbridge.com/en/news/258900079.md) - [zh-HK](https://longbridge.com/zh-HK/news/258900079.md) --- > Supported Languages: [简体中文](https://longbridge.com/zh-CN/news/258900079.md) | [繁體中文](https://longbridge.com/zh-HK/news/258900079.md) # LXTG plans to invest 237 million yuan to construct an energy-saving upgrade and transformation project for carbon black tail gas waste heat power generation units According to the announcement from LXTG (002442.SZ), the company plans to invest in the energy-saving upgrade and transformation project of the carbon black tail gas waste heat power generation unit, with a planned investment amount of 237 million yuan and a construction period of 11 months. The project will be connected to the grid using the "self-generated and self-used, surplus electricity online" method. It will be constructed in two phases: the first phase includes the main plant building, carbon black tail gas boiler, steam turbine, generator set, desulfurization, and supporting facilities for water supply, power supply, environmental protection, fire safety, and health and safety. The second phase will involve the construction of the carbon black tail gas boiler. This project is an upgrade and transformation of the existing carbon black tail gas power generation units and supporting environmental protection facilities at the company's Shahe production base. The existing generator sets have been in use for over 10 years, with aging equipment and relatively low energy utilization efficiency. This energy-saving upgrade will transform the existing steam turbine generator set into a set of ultra-high temperature and ultra-high pressure steam turbine generator sets, improving energy recovery and utilization efficiency by 31%, which is beneficial for the company to enhance energy efficiency ### Related Stocks - [LXTG (002442.CN)](https://longbridge.com/en/quote/002442.CN.md) ## Related News & Research - [A Look At Star Plus Legend Holdings’ Valuation As Guidance Swings From Profit To Loss](https://longbridge.com/en/news/279105880.md) - [Fosun Pharma Unit Gets China Nod for Hematological Malignancy Drug Trial](https://longbridge.com/en/news/279052280.md) - [CITIC Securities Offers Guarantee to Unit's $9.8 Million Bond Issuance](https://longbridge.com/en/news/278658777.md) - [BREAKINGVIEWS-Gulf states can make a financial point to Trump](https://longbridge.com/en/news/279040988.md) - [Israeli strike kills three in Gaza as regional offensives escalate](https://longbridge.com/en/news/279081023.md)