--- title: "City of Pirot in Serbia plans solar power plant on remediated unsanitary landfill" description: "The City of Pirot in Serbia plans to build a solar power plant on a remediated unsanitary landfill, enhancing its renewable energy leadership. The Ministry of Environmental Protection has allocated EU" type: "news" locale: "en" url: "https://longbridge.com/en/news/260070916.md" published_at: "2025-10-06T15:07:12.000Z" --- # City of Pirot in Serbia plans solar power plant on remediated unsanitary landfill > The City of Pirot in Serbia plans to build a solar power plant on a remediated unsanitary landfill, enhancing its renewable energy leadership. The Ministry of Environmental Protection has allocated EUR 2 million for remediation, with Pirot adding EUR 500,000. The project includes a 3 MW solar plant to supply electricity to the city, with additional land for businesses and other uses under consideration. Pirot is also developing a regional waste management center and has joined the Clean Air Regions Initiative, reflecting its commitment to environmental sustainability. ## The City of Pirot plans to build a solar power plant on the site of a former unsanitary landfill when it is remediated. The move would strengthen its leadership position in Serbia regarding the use of renewable energy and environmental protection. In 2013, Pirot opened a regional sanitary landfill, which cost EUR 11 million. It enabled the local authority to shut down an unsanitary landfill on the right bank of the Nišava river. However, the land still hasn’t been remediated and reclaimed. Now the Ministry of Environmental Protection of Serbia has approved EUR 2 million for the works, Serbia’s public broadcaster RTS reported. With the completion of remediation, the possibility opens up for the six hectares of land in the country’s southeast to be repurposed. > Solar panels would be installed on three hectares Mayor of Pirot Vladan Vasić said that the documentation for the remediation of the landfill is complete. The city intends to add EUR 500,000 to the EUR 2 million received from the government and complete the first phase. He plans for the second phase to be approved next year, to solve the decades-long issue in an environmentally acceptable way. Vasić revealed one and a half to two hectares would be allocated for businesses, adding that the purpose of the remaining land is still under consideration. > A photovoltaic plant would be the most cost-effective solution One idea is to install a 3 MW solar power plant that would supply electricity to the city authority, he pointed out. Other ideas are a football stadium, a golf course, afforestation, and a park. The photovoltaic plant would be the most cost-effective solution, Vasić added. Of note, there is a solar power plant on the roof of the building of public waste utility Regional Landfill Pirot. The 150 kW facility began operating in August last year. The city officials claim it is the largest PV plant in Pirot county. ### The first cooperative solar power plants in Serbia are located on the Stara Planina mountain Pirot is also developing a regional waste management center. In 2022, the city signed a contract for the construction of the second landfill body, a composting plant, and a biogas facility. The additional segment would extend the operation of the sanitary landfill by 20 years, while the biogas collection system would enable the collection of methane from the landfill. A system for treating construction waste to enable material recycling is planned as well. As for solar energy, not far from the city, the Stara Planina mountain is the home of the first cooperative solar power plants in Serbia. The local authority participated in the project. They were put into operation last year. In mid-2023, PV projects were under development for over 125 MW in total capacity on the city’s territory. Of note, this year Pirot became the 13th local authority to join the Clean Air Regions Initiative, initiated by the Energy Community Secretariat. Post Views: 56 ### Related Stocks - [WM.US - Waste](https://longbridge.com/en/quote/WM.US.md) ## Related News & Research | Title | Description | URL | |-------|-------------|-----| | SOLV Energy 是對太陽能的投資。它在 IPO 當天股價飆升 | 根據《工程新聞記錄》,這是第二大太陽能建設公司,基於其 2024 年的收入 | [Link](https://longbridge.com/en/news/275672105.md) | | 印度太陽能公司有限公司在 12 月季度的淨利潤為 12.2 億盧比 | 印度太陽能公司 2023 年 12 季度淨利潤為 12.2 億盧比 | [Link](https://longbridge.com/en/news/275567275.md) | | CIE Automotive India 的太陽能領域嘗試和技術轉型可能會改變投資 CIE Automotive (BME:CIE) 的理由 | CIE Automotive India 宣佈在一個太陽能項目中投資 ₹2.63 億,反映出其向可再生能源的轉型。公司的股票評級已提升,目標到 2028 年實現 €43 億的收入和 €4.18 億的盈利。然而,貨幣波動仍然是一個風險。分析師 | [Link](https://longbridge.com/en/news/275848916.md) | | YESS Power 將電池系統與北馬其頓的 Novaci 光伏電站進行整合 | 土耳其的 YESS Power 在北馬其頓的 Novaci 太陽能公園推出了一套 30 兆瓦的電池儲能系統(BESS),標誌着該地區首個規模化電網設施的問世。該項目與 Mey Energy 和 Cubenergy 合作,旨在增強西巴爾幹地區 | [Link](https://longbridge.com/en/news/275923300.md) | | 康寧的太陽能計劃面臨執行、政策以及市場波動的風險 | 康寧公司 (GLW) 在其太陽能業務中面臨重大風險,包括執行挑戰、合規性、供應鏈問題和市場波動。該公司對政府激勵措施的依賴以及對政策變化的敏感性可能會影響盈利能力。此外,太陽能市場的快速變化可能會妨礙長期規劃。儘管面臨這些挑戰,華爾街對 G | [Link](https://longbridge.com/en/news/275967454.md) | --- > **Disclaimer**: This article is for reference only and does not constitute any investment advice.