--- title: "Aemetis Announces $30 Million Energy Efficiency Upgrade at California Ethanol Plant to Lower Carbon Intensity" description: "Aemetis Inc. has announced a $30 million energy efficiency upgrade at its ethanol plant in Keyes, California, integrating a Mechanical Vapor Recompression (MVR) system. This project aims to reduce car" type: "news" locale: "en" url: "https://longbridge.com/en/news/260158089.md" published_at: "2025-10-07T11:57:44.000Z" --- # Aemetis Announces $30 Million Energy Efficiency Upgrade at California Ethanol Plant to Lower Carbon Intensity > Aemetis Inc. has announced a $30 million energy efficiency upgrade at its ethanol plant in Keyes, California, integrating a Mechanical Vapor Recompression (MVR) system. This project aims to reduce carbon intensity and enhance operational efficiency, supported by approximately $19.7 million in grants and tax credits from various sources, including the California Energy Commission. The upgrade utilizes regulatory programs like the Low Carbon Fuel Standard and Section 45Z production tax credits. Aemetis Inc. announced an energy efficiency upgrade at its 65 million gallon per year ethanol plant in Keyes, California, with the integration of a Mechanical Vapor Recompression (MVR) system. The $30 million project involves equipment supplied by Praj Industries and project execution by NPL Construction Co., a subsidiary of Centuri Holdings. The upgrade is intended to reduce the carbon intensity of ethanol production and improve operational efficiency. According to the company, the project leverages regulatory programs such as the Low Carbon Fuel Standard (LCFS) and Section 45Z production tax credits. The initiative has received approximately $19.7 million in grants and tax credits from the California Energy Commission, Pacific Gas & Electric, and federal Section 48C tax credits. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Aemetis Inc. published the original content used to generate this news brief on October 07, 2025, and is solely responsible for the information contained therein. © Copyright 2025 - Public Technologies (PUBT) Original Document: here ### Related Stocks - [AMTX.US - Aemetis](https://longbridge.com/en/quote/AMTX.US.md) ## Related News & Research | Title | Description | URL | |-------|-------------|-----| | Aemetis Biogas 延长了还款期限,并将信贷额度提高至 1.147 亿美元 | Aemetis Inc. 已将其 A 类优先单位的还款截止日期从 2025 年 12 月 31 日延长至 2026 年 4 月 30 日,并将总回购价格提高至 1.147 亿美元。如果未能在新截止日期之前进行还款,将生效一项最低利率为 16 | [Link](https://longbridge.com/en/news/275177015.md) | | Aemetis 与 Protair-X Technologies 和 Third Eye Capital 签署了关于 A 系列优先单位购买协议的修正案 | Aemetis 通过其子公司 Aemetis Biogas 与 Protair-X Technologies 和 Third Eye Capital 签署了其 A 系列优先单位购买协议的修订。该修订将所有未赎回的 A 系列优先单位的赎回截止 | [Link](https://longbridge.com/en/news/275177226.md) | | “做多能源 + 做空可选消费” –当下火遍华尔街的 “配对交易组合” | 科技股主导地位动摇,能源股因油价反弹和 AI 发展的巨大能耗需求而表现强劲;分析认为做空可选消费是因为零售数据疲软、企业盈利预期差引发对消费者健康状况的担忧,且相比直接做空具有颠覆能力的科技股,做空该板块风险更可控。 | [Link](https://longbridge.com/en/news/276087906.md) | | SunCoke 能源|10-K:2025 财年营收 18.37 亿美元超过预期 | | [Link](https://longbridge.com/en/news/276476592.md) | | PBF 能源|8-K:2025 财年 Q4 营收 71.4 亿美元超过预期 | | [Link](https://longbridge.com/en/news/275749250.md) | --- > **Disclaimer**: This article is for reference only and does not constitute any investment advice.