--- title: "CH ENERGY ENG signed a contract for the Tonghua Xuangang Phase II 2×660,000 kW general contracting project with China Electric Power Engineering Northwest Institute" type: "News" locale: "en" url: "https://longbridge.com/en/news/261728974.md" description: "According to the news from the \"Northwest Electric Power Design Institute\" WeChat official account, on October 18th, CH ENERGY ENG's Northwest Institute signed a successful contract with Jinkong Power Holdings Shanxi Electric Power Co., Ltd. in Xi'an for the total contracting project of Tongxing Shanxi Power Generation Co., Ltd. for the second phase of the Xuangang project, which includes 2×660,000 kilowatts. The second phase of the Xuangang project is located in Xuangang Town, Yuanping City, Xinzhou City, Shanxi Province, and plans to build two 660,000 kilowatt ultra-supercritical, once reheated, direct air-cooled coal-fired generating units based on the first phase of the project, along with the construction of desulfurization, denitrification, and dust removal facilities" datetime: "2025-10-18T13:04:41.000Z" locales: - [zh-CN](https://longbridge.com/zh-CN/news/261728974.md) - [en](https://longbridge.com/en/news/261728974.md) - [zh-HK](https://longbridge.com/zh-HK/news/261728974.md) --- > Supported Languages: [简体中文](https://longbridge.com/zh-CN/news/261728974.md) | [繁體中文](https://longbridge.com/zh-HK/news/261728974.md) # CH ENERGY ENG signed a contract for the Tonghua Xuangang Phase II 2×660,000 kW general contracting project with China Electric Power Engineering Northwest Institute According to the official account of the "Northwest Electric Power Design Institute," on October 18, CH ENERGY ENG's Northwest Institute signed a successful contract with Jinkong Power Holdings Shanxi Electric Power Co., Ltd. in Xi'an for the total contracting project of the Tongxing Shanxi Power Generation Co., Ltd. Tonghua Xuangang Phase II 2×660,000 kW. The Tonghua Xuangang Phase II project is located in Xuangang Town, Yuanping City, Xinzhou City, Shanxi Province, and plans to build two 660,000 kW ultra-supercritical, once reheated, direct air-cooled coal-fired generating units based on the first phase of the project, along with the construction of desulfurization, denitrification, and dust removal facilities ### Related Stocks - [CH ENERGY ENG (601868.CN)](https://longbridge.com/en/quote/601868.CN.md) - [CH ENERGY ENG (03996.HK)](https://longbridge.com/en/quote/03996.HK.md) - [Jinkong Power (000767.CN)](https://longbridge.com/en/quote/000767.CN.md) ## Related News & Research - [MSC announces emergency fuel surcharge on some trade routes](https://longbridge.com/en/news/277821792.md) - [Air China's deputy chairman resigns due to retirement](https://longbridge.com/en/news/277920104.md) - [PowerChina's Newly-Signed Contract Amount Slides 15% in January](https://longbridge.com/en/news/277713768.md) - [Guotai Haitong Keeps Their Buy Rating on Cirrus Aircraft Limited (2507)](https://longbridge.com/en/news/277407041.md) - [Nine Dragons Paper Holdings (NDGPF) Receives a Buy from GF Securities](https://longbridge.com/en/news/277339226.md)