---
title: "Getchell Gold Corp. Reports High-Grade Gold Intercepts at Fondaway Canyon Project"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/272377560.md"
datetime: "2026-01-13T08:00:33.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/272377560.md)
  - [en](https://longbridge.com/en/news/272377560.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/272377560.md)
---

> Supported Languages: [简体中文](https://longbridge.com/zh-CN/news/272377560.md) | [繁體中文](https://longbridge.com/zh-HK/news/272377560.md)


# Getchell Gold Corp. Reports High-Grade Gold Intercepts at Fondaway Canyon Project

Getchell Gold Corp. has reported final assay results from its 2025 drill program at the Fondaway Canyon gold project in Nevada. The program, totaling 3,346 meters over ten drill holes, aimed to extend gold mineralization at the North Fork zone and expand the project’s mineral resource. Highlights include drill hole FCG25-38, which intersected 2.8 grams per tonne (g/t) gold over 40.8 meters, including a higher-grade interval of 5.4 g/t gold over 8.0 meters, and an additional interval grading 2.9 g/t gold over 15.1 meters. Drill hole FCG25-37 returned 1.2 g/t gold over 23.2 meters and another interval of 2.6 g/t gold over 8.9 meters, indicating the potential for further resource expansion and new discoveries at Fondaway Canyon. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Getchell Gold Corp. published the original content used to generate this news brief via CNW (Ref. ID: C9423) on January 13, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT)

## Related News & Research

- [Yukon Metals Expands Star River Footprint After High-Grade Gold Hit](https://longbridge.com/en/news/281583530.md)
- [Platina launches major Phase 3 drilling at Mt McKenna gold project](https://longbridge.com/en/news/280921482.md)
- [Awalé Hits 36.2 g/t Gold over 6 Metres at Charger, Confirming High-Grade Gold Continuity to 400 Metres Below Surface | AWLRF Stock News](https://longbridge.com/en/news/281178679.md)
- [Gold Hunter shifts from quiet buildup to fully funded drilling push at Newfoundland gold district](https://longbridge.com/en/news/281261616.md)
- [Gold Orogen Drills and Further Tests Continuation of Williams Brook Gold Mineralization Trend at Mcintyre Brook, New Brunswick](https://longbridge.com/en/news/281032004.md)