---
title: "PSC: Mumbezhi Copper Project advances with over 1Mt CuEq and strong growth prospects"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/290487705.md"
description: "Advancing a large-scale copper project in Zambia, the team has grown the Mumbezhi resource to over 1Mt CuEq, supported by strong metallurgical results and by-product credits. Ongoing exploration and a robust development pipeline position the project for scalable growth.Original document: Prospect Resources Ltd. [PSC] Slides Release — Jun. 22 2026DisclaimerThis is an AI-generated summary and may contain inaccuracies. Please verify any important information with the original source."
datetime: "2026-06-22T23:35:07.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/290487705.md)
  - [en](https://longbridge.com/en/news/290487705.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/290487705.md)
generator: "portal-rs"
---

# PSC: Mumbezhi Copper Project advances with over 1Mt CuEq and strong growth prospects

Advancing a large-scale copper project in Zambia, the team has grown the Mumbezhi resource to over 1Mt CuEq, supported by strong metallurgical results and by-product credits. Ongoing exploration and a robust development pipeline position the project for scalable growth.

Original document: Prospect Resources Ltd. \[PSC\] Slides Release — Jun. 22 2026

**Disclaimer**

This is an AI-generated summary and may contain inaccuracies. Please verify any important information with the original source.

### Related Stocks

- [PSC.AU](https://longbridge.com/en/quote/PSC.AU.md)

## Related News & Research

- [ASL: Advancing a 136Moz AgEq silver-gold project in Chile with A$40M equity raise for restart and growth](https://longbridge.com/en/news/297780444.md)
- [ABN AMRO Corporate Investments says portfolio firms avoid 269,592 tons CO2e in 2025 impact report](https://longbridge.com/en/news/297881828.md)
- [Aztec Minerals drills 83.8 m at 1.31 g/t AuEq at Tombstone project in Arizona](https://longbridge.com/en/news/297774759.md)
- [Panoro Minerals outlines Cotabambas copper-gold project high-grade strategy in investor presentation](https://longbridge.com/en/news/298140745.md)
- [Vizsla Copper intersects 49.2 m at 4.7% CuEq at Palmer project in Alaska](https://longbridge.com/en/news/297910137.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**