---
title: "Purepoint Uranium intersects 5.6-meter radioactive zone at Dorado’s Nova, peaks at 53,300 cps"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/294374529.md"
description: "Purepoint Uranium reported Phase 1 drilling results at its Dorado project, jointly operated with IsoEnergy. Hole NV26-11 intersected a 5.6-meter radioactive zone averaging 11,730 cps and peaking at 53,300 cps, supporting the continuity of the Nova mineralized system. Four holes were completed before a mid-program break, with drilling resuming in two weeks. Laboratory uranium assays are pending, as current readings reflect natural gamma radiation."
datetime: "2026-07-30T13:25:36.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/294374529.md)
  - [en](https://longbridge.com/en/news/294374529.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/294374529.md)
generator: "portal-rs"
---

# Purepoint Uranium intersects 5.6-meter radioactive zone at Dorado’s Nova, peaks at 53,300 cps

-   Purepoint reported Phase 1 results from its 2026 summer drilling at the Dorado uranium project, operated in a 50⁄50 joint venture with IsoEnergy. \* Hole NV26-11 at the Nova discovery cut 5.6 meters of continuous radioactivity averaging 11,730 cps, peaking at 53,300 cps. \* The interval included 1.7 meters averaging 31,800 cps, supporting the interpreted continuity and orientation of the Nova mineralized system. \* Four holes were completed before a mid-program break; drilling is set to resume in two weeks. \* Laboratory uranium assays are pending; downhole probe readings reflect natural gamma radiation rather than grades. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Purepoint Uranium Group Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 202607300924NEWSFILECNPR\_\_\_\_20260730\_307284\_1) on July 30, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT)

### Related Stocks

- [ISOU.US](https://longbridge.com/en/quote/ISOU.US.md)

## Related News & Research

- [Arbor Metals reports Phase 1 2026 drilling at Jarnet lithium project tops 260 ppm Li over 0.61 m](https://longbridge.com/en/news/297909835.md)
- [Geiger Makes New Uranium Discovery at the Previously Undrilled Fox Zone, Directly on Trend with Orano's Kiggavik Uranium Deposits | BSENF Stock News](https://longbridge.com/en/news/297633664.md)
- [Terra Rossa Gold starts drilling at Vetas gold project in Colombia](https://longbridge.com/en/news/297782205.md)
- [Dynasty Commences Metallurgical Drilling at Thundercloud | DGDCF Stock News](https://longbridge.com/en/news/297924425.md)
- [ESGold starts 5,000-meter diamond drilling program at Montauban project in Quebec](https://longbridge.com/en/news/297905952.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**