---
title: "Goldwind-powered Ummbila Emoyeni wind farm phase one in South Africa enters commercial operation at 155 MW"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/294789404.md"
description: "Goldwind's 155 MW Ummbila Emoyeni Wind Farm Phase One in South Africa has entered commercial operation using 25 GWH182-6.2 MW turbines. The broader Ummbila renewable hub targets 750 MW wind, 150 MW solar PV, and 800 MWh storage by 2027. Goldwind also signed a cooperation agreement with Seriti Green for Phase 4. Phase One is expected to generate 480,000 MWh annually, powering 500,000 households and reducing CO2 emissions by 400,000 tonnes."
datetime: "2026-08-04T08:19:41.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/294789404.md)
  - [en](https://longbridge.com/en/news/294789404.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/294789404.md)
generator: "portal-rs"
---

# Goldwind-powered Ummbila Emoyeni wind farm phase one in South Africa enters commercial operation at 155 MW

-   Goldwind’s 155 MW Ummbila Emoyeni Wind Farm Phase One in South Africa entered commercial operation using 25 GWH182-6.2 MW turbines. \* The Ummbila renewable hub targets 750 MW wind, 150 MW solar PV, 800 MWh storage; full completion is slated for 2027. \* Goldwind signed a cooperation agreement with Seriti Green for Phase 4, extending the partners’ long-term project pipeline. \* Phase One is expected to generate about 480,000 MWh a year, supplying roughly 500,000 households, cutting about 400,000 tonnes of CO2 annually. \* Goldwind’s installed capacity in South Africa is projected to exceed 2.2 GW by Q2 2027. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Goldwind Science & Technology Co. Ltd. published the original content used to generate this news brief on August 04, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT) Original Document: here

### Related Stocks

- [02208.HK](https://longbridge.com/en/quote/02208.HK.md)
- [002202.CN](https://longbridge.com/en/quote/002202.CN.md)

## Related News & Research

- [Aksa Enerji Signs Turbine Deal for Manisa Wind and Storage Project](https://longbridge.com/en/news/295528032.md)
- [Goldwind files HKEX next-day disclosure return on share repurchase for cancellation](https://longbridge.com/en/news/293186547.md)
- [ERG commissions Montbéliard wind farm in France after repowering, lifting capacity to 22.5 MW](https://longbridge.com/en/news/297602320.md)
- [Romande Energie starts construction of 10-MW Muids wind farm in France](https://longbridge.com/en/news/297624922.md)
- [Cupid share price in focus on board approval to set up manufacturing venture in South African](https://longbridge.com/en/news/297455298.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**