---
title: "Hock Lian Seng explains FY2026 interim miss after project costs rise, claims talks stall"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/294940577.md"
description: "Hock Lian Seng explained its FY2026 interim miss, citing higher-than-anticipated project costs due to design enhancements, inflation, and material price hikes. Despite earlier guidance suggesting profitability, inconclusive claims discussions with project owners led to a contract margin cut and an onerous provision. The company noted that price fluctuation clauses did not fully offset added scope costs for projects like Aviation Park and Serangoon North Stations."
datetime: "2026-08-05T09:23:20.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/294940577.md)
  - [en](https://longbridge.com/en/news/294940577.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/294940577.md)
generator: "portal-rs"
---

# Hock Lian Seng explains FY2026 interim miss after project costs rise, claims talks stall

-   Hock Lian Seng issued a clarification on why guidance given in April and May diverged from its 1H ended June 30, 2026 results. \* Earlier guidance pointed to civil engineering revenue comparable to FY2025, with management stating all ongoing projects remained profitable. \* The group cited higher-than-anticipated costs tied to design enhancements, enabling works, inflation, transport, subcontractors, steel, concrete, manpower. \* Claims discussions with project owners stayed inconclusive by early July, prompting a contract margin cut and an onerous contract provision. \* Aviation Park Station was about 70% complete; Serangoon North Station about 46%; price fluctuation clauses did not fully offset added scope costs. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Hock Lian Seng Holdings Limited published the original content used to generate this news brief via Singapore Exchange Limited (SGX) (Ref. ID: FKU25HYSD2SXZVE8) on August 05, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT) Original Document: here

### Related Stocks

- [J2T.SG](https://longbridge.com/en/quote/J2T.SG.md)
- [S68.SG](https://longbridge.com/en/quote/S68.SG.md)

## Related News & Research

- [Hock Lian Seng swings to FY26 1H net loss of S$54 million; revenue drops 50.9% to S$50.7 million](https://longbridge.com/en/news/294940247.md)
- [Hock Lian Seng expects operating loss in 1H2026, swings from S$10 million profit before tax](https://longbridge.com/en/news/292044452.md)
- [BREAKINGVIEWS-Huang's return offers China AI only brief respite](https://longbridge.com/en/news/306581008.md)
- [Singapore raises 2026 growth forecast after 6.1% Q3 expansion](https://longbridge.com/en/news/306553231.md)
- [Fed's Williams keeping options open on pace of future US rate hikes](https://longbridge.com/en/news/306548238.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**