---
title: "Keller installs 140 rotary bored piles for Port Talbot electric arc furnace project"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/295925909.md"
description: "Keller Group has commenced the second phase of works for the Port Talbot electric arc furnace project, installing 140 large-diameter rotary bored piles up to 36.5 meters deep. The broader scope involves constructing 1,350 piles in total, including over 330 CFA piles and more than 200 restricted-access piles, to prepare the site for the new furnace construction."
datetime: "2026-08-14T11:17:30.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/295925909.md)
  - [en](https://longbridge.com/en/news/295925909.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/295925909.md)
generator: "portal-rs"
---

# Keller installs 140 rotary bored piles for Port Talbot electric arc furnace project

-   Keller Group is installing 1,350 piles to prepare the Port Talbot site for construction of a new electric arc furnace. \* Second-phase works started in July, including 140 large-diameter rotary bored piles to depths of up to 36.5 meters. \* Scope also includes more than 330 CFA piles to depths above 31 meters, supported by more than 200 restricted-access piles. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Keller Group plc published the original content used to generate this news brief on August 14, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT) Original Document: here

### Related Stocks

- [KLR.UK](https://longbridge.com/en/quote/KLR.UK.md)

## Related News & Research

- [Aben Gold completes 766 meters of drilling at Justin gold-tungsten project in Yukon, first hole sent for assay](https://longbridge.com/en/news/297641102.md)
- [Bell Copper says Perseverance copper project drilling of hole K-24 continues in Arizona](https://longbridge.com/en/news/297646669.md)
- [Golden Ridge receives permits for up to 40 drill holes at Williams gold property in Newfoundland and Labrador](https://longbridge.com/en/news/297562361.md)
- [Lappland Guldprospektering reports gold hits in five of seven Stortjärnhobben drill holes](https://longbridge.com/en/news/298050565.md)
- [Arbor Metals reports Phase 1 2026 drilling at Jarnet lithium project tops 260 ppm Li over 0.61 m](https://longbridge.com/en/news/297909835.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**