---
title: "Silvercorp reports 212.5-meter gold intercept at Kyzyltash Main Zone in Kyrgyzstan"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/296225160.md"
description: "Silvercorp Metals reported initial drill results from the Main Zone of its fully permitted Kyzyltash Sulfide Gold Project in Kyrgyzstan. Key findings include a 212.5-meter intercept at 1.68 g/t gold and a 39-meter intercept at 4.79 g/t gold. The results cover 29 holes over a 3,640-meter strike length, with mineralization remaining open along strike and at depth. Drilling strategy has shifted to infill work to upgrade resources."
datetime: "2026-08-18T12:03:17.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/296225160.md)
  - [en](https://longbridge.com/en/news/296225160.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/296225160.md)
generator: "portal-rs"
---

# Silvercorp reports 212.5-meter gold intercept at Kyzyltash Main Zone in Kyrgyzstan

-   Silvercorp reported first Main Zone drill results from the fully permitted Kyzyltash Sulfide Gold Project in Kyrgyzstan. \* Key intercept: 212.5 meters at 1.68 g/t gold in hole DH26M687, including 29.5 meters at 3.26 g/t. \* Other highlights included 39 meters at 4.79 g/t gold in DH26M686, including 6 meters at 22.23 g/t. \* Results cover 29 holes over a 3,640-meter strike length; mineralization remains open along strike and at depth. \* Drilling strategy shifted toward in-fill work to upgrade resources; Contact Zone assay results are pending. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Silvercorp Metals Inc. published the original content used to generate this news brief via PR Newswire (Ref. ID: 202608180800PR\_NEWS\_USPR\_\_\_\_\_VA28291) on August 18, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT)

### Related Stocks

- [SVM.US](https://longbridge.com/en/quote/SVM.US.md)

## Related News & Research

- [Arbor Metals reports Phase 1 2026 drilling at Jarnet lithium project tops 260 ppm Li over 0.61 m](https://longbridge.com/en/news/297909835.md)
- [Vizsla Copper intersects 49.2 m at 4.7% CuEq at Palmer project in Alaska](https://longbridge.com/en/news/297910137.md)
- [Faraday Copper reports near-surface copper mineralization in 14 holes at Copper Creek project in Arizona](https://longbridge.com/en/news/297903101.md)
- [Lappland Guldprospektering reports gold hits in five of seven Stortjärnhobben drill holes](https://longbridge.com/en/news/298050565.md)
- [AbraSilver drills 27 m at 0.58 g/t gold near surface at Diablillos Cerro Viejo target in Argentina](https://longbridge.com/en/news/297778200.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**