---
title: "SpaceX Accelerates AI Infrastructure Layout! Colossus Leads Global Computing Power Rankings; Musk Claims Space AI Computing Power Will Surpass Ground Data Centers by End of 2028"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/303890518.md"
description: "SpaceX CEO Elon Musk predicts that by the end of 2028, orbital AI computing power will exceed newly added ground-based computing power. SpaceX is accelerating its layout in AI infrastructure, with its Superintelligence business competing against Microsoft and Google, and plans to launch millions of satellites to build space data centers to overcome ground-based power and cooling bottlenecks"
datetime: "2026-11-02T03:09:02.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/303890518.md)
  - [en](https://longbridge.com/en/news/303890518.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/303890518.md)
generator: "portal-rs"
---

# SpaceX Accelerates AI Infrastructure Layout! Colossus Leads Global Computing Power Rankings; Musk Claims Space AI Computing Power Will Surpass Ground Data Centers by End of 2028

Zhitong Finance APP has learned that SpaceX (SPCX.US) CEO Elon Musk expects that by the end of 2028, the artificial intelligence (AI) computing power deployed in orbit may exceed newly added ground-based computing power. This ambitious vision demonstrates SpaceX's plan to expand into the AI infrastructure sector, while its subsidiary Superintelligence (SI) business is competing with Microsoft (MSFT.US), Google (GOOGL.US), Amazon (AMZN.US), and OpenAI.

Musk stated on the social platform X on October 30 that monthly newly added orbital computing power could surpass newly added ground-based computing power around the end of 2028, and this gap will widen significantly in 2029. He said, "Ground-based computing power will be negligible compared to orbital computing power."

**SpaceX Bets Big on Space Computing! Orbital Data Centers May See True Scale in the 2030s**

In early 2026, SpaceX disclosed a highly disruptive plan for space infrastructure construction, applying to the U.S. Federal Communications Commission (FCC) for permission to launch 1 million data center satellites. SpaceX plans to deploy up to 1 million satellites in low Earth orbit at altitudes of 500 to 2,000 kilometers, intending to use them to build an orbital data center system with hyperscale computing capabilities, directly targeting AI model inference, machine learning, edge computing, and related applications.

Building AI orbital data centers in space helps overcome bottlenecks faced by ground-based AI data centers, including tight power supply, high cooling costs, and large land requirements for construction. SpaceX believes that if it can achieve large-scale, low-cost launches using Starship, combined with Starlink's accumulated capabilities in satellite manufacturing, inter-satellite laser links, and constellation operations, it can further upgrade the "communication constellation" into a "computing constellation."

In late August, Musk announced on platform X that SpaceX's first batch of Starmind AI satellites equipped with NVIDIA (NVDA.US) chips would be launched for the first time in the fourth quarter of 2027, reaching "significant scale" by 2028. This timeline is ahead of the 2028 plan previously disclosed in the prospectus.

On the same day, NVIDIA officially announced that SpaceX AI would deploy its new generation Vera CPU to accelerate Agentic AI workloads, and would send the optimized Vera Rubin NVL72 rack-level system into orbit as the computing core of the first-generation Starmind satellites. This cooperation marks a key turning point for the world's first space AI data center project from concept to engineering implementation.

Orbital data centers will help support large-scale AI construction, but before they truly become practical, a series of major technological breakthroughs are needed. Although Musk plans to launch the first Starmind AI satellites by the end of 2027, other industry observers believe that true large-scale deployment is more likely to occur in the 2030s.

For SpaceX, there are a series of difficulties to overcome. The first is heat dissipation. Ground-based data centers can rely on liquid cooling to manage heat, but in the vacuum environment of space, heat dissipation works quite differently. The second is large-scale data transmission. Transcelestial, a company focused on laser communication, is working to solve a key challenge—how to transmit massive amounts of data back to Earth. There is also the issue of how to provide power for hyperscale deployments.

Furthermore, the cost ledger of orbital data centers is under close scrutiny by Wall Street. Commercial consulting firm Wood Mackenzie estimates that the cost of building a 1-gigawatt orbital data center is approximately $170 billion, more than three times that of traditional ground-based data centers. Morgan Stanley analyst Adam Jonas predicts that SpaceX's AI-related capital expenditures will reach $53 billion in 2026, increasing by another $130 billion in 2027. Blue Origin and Amazon founder Jeff Bezos, along with researcher Andrew McCalip, pointed out that expensive AI chips and high launch costs constitute current industry barriers, and the economic model is not yet reasonable at this stage.

However, supporters argue that space data centers can avoid regulatory hurdles and community backlash associated with ground-based data centers. Meanwhile, SpaceX is attempting to build a vertically integrated supply chain to break down cost barriers and improve the economics of orbital computing. On one hand, it relies on the Starship heavy-lift rocket to significantly reduce launch costs; on the other hand, through a chip factory named Terafab, it collaborates with partners Tesla and Intel to research, develop, and manufacture its own AI chips. By controlling launch services and underlying computing hardware, SpaceX is accelerating the commercialization process of space computing.

**Colossus Leads AI Computing Power Rankings**

As Musk made these remarks, a ranking of major AI computing facilities compiled by Epoch AI showed that SpaceX's SI business's Colossus 2 facility in Memphis currently ranks first. The facility is expected to have computing power equivalent to 1.11 million NVIDIA (NVDA.US) H100 GPUs, higher than the 1.02 million H100-equivalent GPUs owned by OpenAI's Stargate project in Abilene, Texas, and the approximately 818,000 H100-equivalent GPUs owned by the project jointly built by Amazon and Anthropic in New Carlisle, Indiana.

H100-equivalent computing power is a standardized metric for measuring AI computing power, using the performance of NVIDIA (NVDA) H100 graphics processing units (GPUs) as a baseline to estimate the computing power provided by different processors. The H100 is a chip widely used for training and running AI models.

For example, a data center nominally possessing 1 million H100-equivalent computing power does not necessarily have 1 million H100 chips physically installed. It may also adopt newer generations or different types of processors, whose comprehensive estimated performance is equivalent to the aforementioned baseline. This metric helps compare data centers using different generations of hardware, although actual performance will still vary depending on workloads and system configurations.

Epoch AI estimates that as more computing clusters come online, the computing power of Colossus 2 could reach approximately 1.82 million H100-equivalent GPUs by early 2027. Its estimates are based on satellite imagery, cooling infrastructure, and information disclosed by the company, rather than a comprehensive physical count of installed processors.

Although AI computing power is expanding rapidly, its economic benefits remain uncertain. In another discussion on platform X, Musk admitted when discussing usage limits for Grok Bot that the cost of operating this service is too high relative to the revenue it generates, making it difficult to sustain. This statement highlights a core issue facing AI infrastructure investors: whether growing computing demand can generate sufficient revenue to justify the huge investments made to meet these demands.

Previously, venture capitalist Shaun Maguire released a financial forecast predicting that SpaceX's revenue would soar from $51.5 billion in 2026 to $274 billion in 2027, and reach $731 billion in 2028. For investors, these forecasts highlight the huge potential revenue opportunities in the AI infrastructure sector, while also reflecting the capital investment required to build related infrastructure and the execution risks involved.

Shaun Maguire's model assumes that ground-based computing power will expand from 1 gigawatt in early 2026 to 21 gigawatts by the end of 2028, with each gigawatt generating approximately $40 billion in annual revenue. The model predicts that SpaceX's earnings before interest, taxes, depreciation, and amortization (EBITDA) in 2028 will reach $536 billion. However, due to expected annual capital expenditures of up to $369 billion that year, free cash flow is not expected to turn positive until mid-year.

Shaun Maguire is a partner at Sequoia Capital, which holds a significant stake in SpaceX (SPCX). He cautioned that his forecasts carry considerable uncertainty due to potential political obstacles and supply chain constraints. However, Musk hinted that these forecasts might still be conservative. This means that even investors with financial interests in the company may be underestimating SpaceX's growth potential.

Musk also challenged external concerns about the high costs of building AI infrastructure. Kyle Reidhead, analyst and CEO of investment newsletter Milk Road, previously released another forecast suggesting that SpaceX might incur $470 billion in capital expenditures over five quarters and accumulate approximately $150 billion in debt. In response, Musk stated that the market had "seriously underestimated" the company's capital efficiency. Neither of these two forecasts represents the company's published financial results or official guidance.

### Related Stocks

- [SPCX.US](https://longbridge.com/en/quote/SPCX.US.md)
- [DSPC.US](https://longbridge.com/en/quote/DSPC.US.md)
- [LOFF.US](https://longbridge.com/en/quote/LOFF.US.md)
- [SNK.US](https://longbridge.com/en/quote/SNK.US.md)
- [SPAL.US](https://longbridge.com/en/quote/SPAL.US.md)
- [SPCF.US](https://longbridge.com/en/quote/SPCF.US.md)
- [SPCG.US](https://longbridge.com/en/quote/SPCG.US.md)
- [SPCH.US](https://longbridge.com/en/quote/SPCH.US.md)
- [SPCM.US](https://longbridge.com/en/quote/SPCM.US.md)
- [SPCU.US](https://longbridge.com/en/quote/SPCU.US.md)
- [SSPC.US](https://longbridge.com/en/quote/SSPC.US.md)
- [YSPC.US](https://longbridge.com/en/quote/YSPC.US.md)

## Related News & Research

- [Elon Musk Says Anthropic 'Extremely Likely' to Expand SpaceX Compute Deal, Could Seek 10 Gigawatts More: 'That’s a Big Number'](https://longbridge.com/en/news/306101359.md)
- [Space Exploration Technologies (SPCX) Gets A New Hiring Twist As Musk Eyes Top AI Talent](https://longbridge.com/en/news/306383945.md)
- [Musk Says Renting Computing Power More Profitable Than In-House Grok; Anthropic Early Termination May Pressure SpaceX Stock](https://longbridge.com/en/news/306533240.md)
- [SpaceX Aims to Be World’s Biggest AI Infrastructure Player in 2027](https://longbridge.com/en/news/305992401.md)
- [SpaceX initiated with a Buy at Jefferies](https://longbridge.com/en/news/306402411.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**