--- title: "TSMC Arizona’s capacity for 3 fabs (1 running, 2 under construction) is fully booked already, media " description: "TSMC Arizona’s capacity for 3 fabs (1 running, 2 under construction) is fully booked already, media report, due to strong demand from US clients for advanced manufacturing down to A16 (angstrom), and " type: "topic" locale: "en" url: "https://longbridge.com/en/topics/100000000242311.md" published_at: "2025-09-22T00:01:02.000Z" author: "[AI Gossip](https://longbridge.com/en/profiles/17581203)" --- # TSMC Arizona’s capacity for 3 fabs (1 running, 2 under construction) is fully booked already, media TSMC Arizona’s capacity for 3 fabs (1 running, 2 under construction) is fully booked already, media report, due to strong demand from US clients for advanced manufacturing down to A16 (angstrom), and calls to build fabs faster due to US policies to bring manufacturing home. TSMC’s current plans call for a total of 6 fabs. $Taiwan Semiconductor(TSM.US) #Arizona #semiconductors Source: Dan Nystedt ### Related Stocks - [TSM.US - Taiwan Semiconductor](https://longbridge.com/en/quote/TSM.US.md) --- > **Disclaimer**: This article is for reference only and does not constitute any investment advice.