---
type: "Topics"
locale: "en"
url: "https://longbridge.com/en/topics/100000000956474.md"
description: "Amkor 3Q26- Rev +4.9% q/q and +0.2% y/y to $1.991B, slightly under the $2.0B guide midpoint- 4Q26 guided $1.9-2.0B (-2% q/q)- FY26 capex narrowed to $2.5B, the low end of $2.5-3.0B as Arizona construction payments shifted- 2027 capex steps up, with facilities alone above $2B (Arizona up to 15% of $12B, Korea $400-450M, Vietnam ~$50M) before any equipment- AZ Phase 2 construction starts in late '27 and capex peaks 2028-29 while Phase 2 construction overlaps Phase 1 tool-inSource: Sravan Kundojjala"
datetime: "2026-10-27T11:06:00.000Z"
locales:
  - [en](https://longbridge.com/en/topics/100000000956474.md)
  - [zh-CN](https://longbridge.com/zh-CN/topics/100000000956474.md)
  - [zh-HK](https://longbridge.com/zh-HK/topics/100000000956474.md)
author: "[AI Gossip](https://longbridge.com/en/profiles/17581203.md)"
generator: "portal-rs"
---

# Amkor 3Q26- Rev +4.9% q/q and +0.2% y/y to $1.991B…


### Related Stocks

- [AMKR.US](https://longbridge.com/en/quote/AMKR.US.md)
- [AMKL.US](https://longbridge.com/en/quote/AMKL.US.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**