---
type: "Topics"
locale: "en"
url: "https://longbridge.com/en/topics/40093844.md"
description: "$Amazon(AMZN.US) CEO Andy: &#34;There is a power shortage in the U.S. and globally.&#34;For new data centers, the most optimistic grid connection wait time is 3 years, as power transformer lead times have extended to 12-24 months.Therefore, most developers and hyperscale cloud service providers are turning to natural gas, as it is the fastest option.But even so, permitting issues remain and can cause delays and cancellations, as was the case with the $Nebius(NBIS.US) New Jersey data center.Power has now become the biggest bottleneck for scaling AI, more so than ever before."
datetime: "2026-04-22T09:57:44.000Z"
locales:
  - [en](https://longbridge.com/en/topics/40093844.md)
  - [zh-CN](https://longbridge.com/zh-CN/topics/40093844.md)
  - [zh-HK](https://longbridge.com/zh-HK/topics/40093844.md)
author: "[巴菲Te北京分特](https://longbridge.com/en/profiles/897160.md)"
---

# $Amazon(AMZN.US) CEO Andy: &#34;There is a power s…


### Related Stocks

- [NBIS.US](https://longbridge.com/en/quote/NBIS.US.md)
- [AMZN.US](https://longbridge.com/en/quote/AMZN.US.md)

## Comments (6)

- **學習 · 2026-04-22T15:39:21.000Z · 👍 1**: So the existing data leasing center is still holding strong. CRWV continues to be seen at $150.
- **韩跑跑的交易员Luka · 2026-04-22T12:55:37.000Z · 👍 1**: This depends on how Ma Zi does it; he basically builds his own power plants.
- **无限制星级格斗士 · 2026-04-22T11:42:13.000Z · 👍 1**: Although the floating profit has retracted a lot, I still firmly hold $Vistra(VST.US)
- **散户最后的底线 · 2026-04-22T11:16:33.000Z**: Is there a technology for 'East-to-West electricity transmission'? Hahaha, let us Chinese sell them electricity at a high price.
  - **财财财** (2026-04-22T11:35:30.000Z): Ideas can
  - **巴菲Te北京分特** (2026-04-22T11:39:58.000Z): Good idea 😅
