---
title: "Dayu Irrigation's subsidiary jointly pre-qualified for the integrated urban and rural water supply project in Fan Cheng District, Xiangyang City"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/255779858.md"
description: "Dayu Irrigation's wholly-owned subsidiary, in conjunction with multiple companies, has become the first candidate for the integrated urban and rural water supply project design and construction general contracting (EPC) in Fan District, Xiangyang City, with a pre-bid amount of 161 million yuan and a project duration of 720 days"
datetime: "2025-09-03T11:47:09.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/255779858.md)
  - [en](https://longbridge.com/en/news/255779858.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/255779858.md)
---

# Dayu Irrigation's subsidiary jointly pre-qualified for the integrated urban and rural water supply project in Fan Cheng District, Xiangyang City

According to the Zhitong Finance APP, Dayu Irrigation (300021.SZ) announced that its wholly-owned subsidiary Gansu Dayu Irrigation Group Water Conservancy and Hydropower Engineering Co., Ltd. has become the first candidate for the general contractor (EPC) of the integrated urban and rural water supply project in Fan Cheng District, in a consortium led by Hubei Yulong Water Conservancy and Hydropower Engineering Co., Ltd., along with Hainan Lisheng Water Purification Technology Industrial Co., Ltd., Xiangyang Shuangchen Engineering Consulting Co., Ltd., China Mobile System Integration Co., Ltd., and Hubei Miaosen Engineering Survey and Design Co., Ltd. The pre-bid amount is 161 million yuan, with a total project duration of 720 calendar days

### Related Stocks

- [300021.CN](https://longbridge.com/en/quote/300021.CN.md)

## Related News & Research

- [Avocado pickers in Mexico welcome restart of exports to US, but security fears remain](https://longbridge.com/en/news/296054980.md)
- [Aguas de Palhoca pipe repair disrupts water supply in parts of Bela Vista, Palhoca](https://longbridge.com/en/news/296030916.md)
- [Corsan adds second Taquari River water intake to keep Bom Retiro do Sul supply running during floods](https://longbridge.com/en/news/296114775.md)
- [Newfoundland and Quebec strike updated deal on electricity generation](https://longbridge.com/en/news/296130442.md)
- [Galaxy Gaming cancels remaining outstanding warrants for USD 1.2 million](https://longbridge.com/en/news/296102444.md)