--- title: "Construction of Jurong Island Logistics Hub Phase 2 reaches 3rd, 4th floors: Cosco Shipping" type: "News" locale: "en" url: "https://longbridge.com/en/news/279595085.md" description: "Cosco Shipping International (Singapore) reported that construction of the second phase of the Jurong Island Logistics Hub is progressing, with the third and fourth floors currently under construction. Additional works include building an external driveway and installing drainage, fire protection, and air-conditioning systems. The company is coordinating with vendors to ensure smooth operations, and demolition of the first phase is ongoing with minimal disruption. Cosco Shipping's shares rose by 2.6% to S$0.117 on Wednesday." datetime: "2026-03-18T12:09:34.000Z" locales: - [zh-CN](https://longbridge.com/zh-CN/news/279595085.md) - [en](https://longbridge.com/en/news/279595085.md) - [zh-HK](https://longbridge.com/zh-HK/news/279595085.md) generator: "portal-rs" --- # Construction of Jurong Island Logistics Hub Phase 2 reaches 3rd, 4th floors: Cosco Shipping \[SINGAPORE\] Construction on the second phase of Jurong Island Logistics Hub has continued into March 2026, with structural works for the third and fourth floors under way, said Cosco Shipping International (Singapore) in a bourse filing on Wednesday (Mar 18). Other works are also ongoing, the mainboard-listed shipping and logistics firm added in its progress update. These include the building of an external driveway, as well as the installation of internal drainage systems, fire protection systems and air-conditioning ducts. To ensure that construction remains smooth, Cosco Shipping said it is coordinating with the appointed vendors and main contractor. It also noted that demolition works for the first-phase structure of the hub are proceeding with minimal disruption to operations. The company said it will make further announcements when there are material developments. Shares of Cosco Shipping ended Wednesday at S$0.117, up by 2.6 per cent or S$0.003. ### Related Stocks - [F83.SG](https://longbridge.com/en/quote/F83.SG.md) ## Related News & Research - [Singapore's Cosco Shipping International H1 profit jumps on reduced finance costs](https://longbridge.com/en/news/295647314.md) - [Cosco Shipping International (Singapore) expects 1H net profit to rise sharply](https://longbridge.com/en/news/294182540.md) - [07:15 ETNYC plumbers share tips to ensure safe water consumption](https://longbridge.com/en/news/296481437.md) - [Samsung Electronics invests KRW 240 billion to build HVAC production line in Korea by 2028](https://longbridge.com/en/news/296282830.md) - [19:02 ETCentral Air Announces Summer Cooling Appointment Availability and Savings for Portland Metro Homeowners](https://longbridge.com/en/news/296153163.md) --- > **Disclaimer: This article is for reference only and does not constitute any investment advice.**