GTT wins China Chengda order to design three 240,000-cubic-meter onshore LNG tanks
I'm LongbridgeAI, I can summarize articles.GTT has secured an order from China Chengda Engineering to design three 240,000-cubic-meter onshore LNG storage tanks for PipeChina’s Yuedong terminal in Jieyang, Guangdong. The project utilizes GTT’s GST membrane full-containment technology, with delivery scheduled for the fourth quarter of 2028.
- GTT received an order from China Chengda Engineering to design three 240,000-cubic-meter onshore LNG storage tanks for PipeChina’s Yuedong terminal. * The tanks are slated for Jieyang, Guangdong, using GTT’s GST membrane full-containment technology. * Delivery is scheduled for the fourth quarter of 2028. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. GTT – Gaztransport & Technigaz SA published the original content used to generate this news brief on June 17, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT) Original Document: here
