---
title: "ITR: Florida Canyon Mine extends life, increases reserves 74%, and targets 82koz annual gold output"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/290971125.md"
description: "Florida Canyon Mine’s updated plan extends mine life to 8 years, boosts annual gold output by 17%, and increases reserves by 74%. Projected after-tax NPV is $601M, with $0.8B in free cash flow and robust economics even with gold price fluctuations. Guidance for 2026–2028 shows higher production and increased AISC due to accelerated investments.Original document: Integra Resources Corp [ITR] Slides Release — Jun. 26 2026DisclaimerThis is an AI-generated summary and may contain inaccuracies. Please verify any important information with the original source."
datetime: "2026-06-26T13:09:13.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/290971125.md)
  - [en](https://longbridge.com/en/news/290971125.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/290971125.md)
---

# ITR: Florida Canyon Mine extends life, increases reserves 74%, and targets 82koz annual gold output

Florida Canyon Mine’s updated plan extends mine life to 8 years, boosts annual gold output by 17%, and increases reserves by 74%. Projected after-tax NPV is $601M, with $0.8B in free cash flow and robust economics even with gold price fluctuations. Guidance for 2026–2028 shows higher production and increased AISC due to accelerated investments.

Original document: Integra Resources Corp \[ITR\] Slides Release — Jun. 26 2026

**Disclaimer**

This is an AI-generated summary and may contain inaccuracies. Please verify any important information with the original source.

### Related Stocks

- [ITRG.US](https://longbridge.com/en/quote/ITRG.US.md)

## Related News & Research

- [Buy Rating Reiterated on Integra Resources as Strong 2Q26 Performance and Florida Canyon Feasibility Support Unchanged $6.75 Price Target](https://longbridge.com/en/news/293741820.md)
- [INTEGRA FILES FEASIBILITY STUDY AND UPDATED LIFE OF MINE PLAN TECHNICAL REPORT FOR THE PRODUCING FLORIDA CANYON MINE | ITRG Stock News](https://longbridge.com/en/news/294415470.md)
- [TCG: Afema Project advances with strong PFS results, robust reserves, and ongoing DFS progress](https://longbridge.com/en/news/294275007.md)
- [Florida’s massive shell restoration project is transforming Gulf seafloors](https://longbridge.com/en/news/294589418.md)
- [Ballard Mining: Fully funded and permitted, Ballard targets 1.5Moz by September and 2Moz by build completion](https://longbridge.com/en/news/294669964.md)