Jaguar Mining drilling links Chamé to Bahú corridor, outlines 15-km Paciencia gold district in Brazil
I'm LongbridgeAI, I can summarize articles.Jaguar Mining reported Phase 1 drill results along Brazil's Paciencia Trend, outlining a connected mineral system over 15 km. Key intercepts included 32.21 m at 0.37 g/t Au at Chamé and 7.85 m at 2.03 g/t at Santa Isabel-Marzagão. Drilling extended the Santa Isabel structure 1 km beyond current workings, supporting mine extension potential. The Paciencia district holds inferred resources of 189,000 oz Au, while Santa Isabel is targeted for reopening by end-2026.
- Jaguar Mining reported first-phase drill results along Brazil’s Paciencia Trend, outlining a connected mineral system over more than 15 km. * Phase 1 totaled 3,764 meters across 17 holes, spanning the Chamé target through Santa Isabel/Marzagão toward the Bahú area. * Notable intercepts included 32.21 m at 0.37 g/t gold at Chamé, 7.85 m at 2.03 g/t at Santa Isabel-Marzagão. * Drilling traced the Santa Isabel structure about 1 km beyond current underground workings, supporting potential mine extension. * Paciencia hosts inferred underground resources of 189,000 ounces across 1,423,000 tonnes at 4.14 g/t; Santa Isabel is being readied for possible reopening by end-2026. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Jaguar Mining Inc. published the original content used to generate this news brief via ACCESS Newswire (Ref. ID: 202607080700ACCESSWRNAPR_____1187704) on July 08, 2026, and is solely responsible for the information contained therein. © Copyright 2026 - Public Technologies (PUBT)
