---
title: "Grand Sunergy Tech: Expected net loss of RMB 150 million to RMB 75 million in the first half of 2026"
type: "News"
locale: "en"
url: "https://longbridge.com/en/news/292600580.md"
description: "Grand Sunergy Tech announced that it expects a net loss of between 75 million yuan and 150 million yuan in the first half of 2026. The loss in the same period last year was 96.3384 million yuan. The company pointed out that due to intensified competition in the photovoltaic industry, there is insufficient operating rate, low capacity utilization, and high fixed costs, resulting in inadequate profitability"
datetime: "2026-07-14T09:43:27.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/292600580.md)
  - [en](https://longbridge.com/en/news/292600580.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/292600580.md)
generator: "portal-rs"
---

# Grand Sunergy Tech: Expected net loss of RMB 150 million to RMB 75 million in the first half of 2026

Grand Sunergy Tech announced that it expects to achieve a net loss attributable to shareholders of the listed company of between 150 million yuan and 75 million yuan for the first half of 2026. After deducting non-recurring gains and losses, the company expects a net loss attributable to shareholders of the listed company of between 145 million yuan and 70 million yuan for the first half of 2026. In the same period last year, the net loss attributable to the parent company's owners was 96.3384 million yuan. Due to the increasingly fierce competition in the photovoltaic industry, the company's operating rate in the first half of the year was insufficient, capacity utilization was low, fixed costs were high, and profitability was inadequate

### Related Stocks

- [603778.CN](https://longbridge.com/en/quote/603778.CN.md)

## Related News & Research

- [CRCC schedules interim results presentation on SSE Roadshow](https://longbridge.com/en/news/296611250.md)
- [REG - Cerillion PLC - TR-1 Notification](https://longbridge.com/en/news/296370992.md)
- [Instabank sets new bond interest rate at 11.55%](https://longbridge.com/en/news/296612481.md)
- [FirstRand Bank schedules bond interest payments due Aug. 31, 2026](https://longbridge.com/en/news/296371541.md)
- [Panoro Energy places USD 50 million senior unsecured bond offering](https://longbridge.com/en/news/296383048.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**