TSM 2X Long ETF

TSMX
96.3804.12% ( -4.140 )
Closed: Oct 7, 16:00:00 (EDT)

TSM 2X Long ETF (TSMX)

Open
96.680
High
97.622
Low
95.982
Prev. Close
100.520
Volume
554.16K
Turnover
53.59M
Avg Price
96.709
Bid/Ask Ratio
--
Amplitude
1.63%
52wk High
105.562
Volume Ratio
0.75
Turnover Ratio
7.49%
52wk Low
38.287
Float Mkt Cap
713.21M
Dividend YieldTTM
4.45%
DividendTTM
4.2843
NAV
--
NAV Date
--
Disc/Prem Rate
--
Total Issued
7.40M
Assets
713.21M
Min lot size
1
Currency
USD

News

Bullish vs. Bearish — Last 3 Months

11.2k followers · 0 opinions
▲Bullish50%
50%Bearish▼
  • D
    Dolphin Research
    Pinned

    $Taiwan Semiconductor(TSM.US) TSMC does not produce a single DRAM chip, yet it is becoming central to high‑performance HBM. From HBM4 onward, two critical steps — a customized base layer and co‑packaging of memory with the GPU — run through TSMC's lines.

    Entry 1: the base layer. It serves as the bottom‑stack 'relay station' in HBM. HBM3e and earlier used simpler 20nm flows that DRAM vendors could make in‑house; with HBM4, nodes move to 12nm and flagships to 2/3nm, forcing outsourced fab to TSMC (Samsung can self‑manufacture).

    The bar is higher because a doubled bus width raises PHY precision requirements, and functions like the memory controller that lived in the XPU are migrating to the base layer. As the base layer shifts from off‑the‑shelf to customer‑specific parts — e.g., NVDA's NVHBM uses a proprietary protocol claiming +30% bandwidth and −15% power — reliance on TSMC's advanced nodes deepens.

    Entry 2: CoWoS packaging. HBM's high bandwidth depends on co‑packaging with the XPU on a silicon interposer, primarily via TSMC's CoWoS, where CoWoS‑L is already mainstream with a >60% share.

    Capacity cadence matters more: DRAM wafers will not meaningfully free up until 2027 (+15%~20%), while CoWoS capacity in 2027 doubles vs. 2026 — packaging is expanding faster than DRAM bits.

    The bottleneck and value are shifting toward packaging and foundry. How much HBM a DRAM vendor can deliver now depends not only on its own lines, but also on how much base‑layer wafer capacity and CoWoS slots it can lock at TSMC.

    Take SK hynix's HBM4: it only handles die fabrication and stacking, while the base layer is co‑designed with NVDA and manufactured by TSMC, and final packaging is also completed at TSMC. If the industry moves toward 'fewer layers, more dies', it saves DRAM wafers but consumes more packaging capacity.

    The choke point shifts further from 'DRAM vendor expansion' to 'TSMC ramp'.

    图片 1,共 2 张
    图片 2,共 2 张
  • A
    AI Gossip

    TSMC’s 3rd quarter revenue rose to a record high NT$1.49 trillion (US$46.70B), beating the top end of guidance ($45.8 billion), on strong demand for AI chip production.

    The prior record was NT$1.27 trillion from the 2nd quarter this year.

    TSMC did not announce Q3 revenue. The figure is based on July-September monthly revenue. 1/3 $Taiwan Semiconductor(TSM.US) $Apple(AAPL.US) $NVIDIA(NVDA.US) $Broadcom(AVGO.US) #semiconductors #semiconductor

    Source: Dan Nystedt

  • 稳
    稳赚大钱

    $Broadcom(AVGO.US)Broadcom continues to attract attention in October as demand for AI infrastructure remains strong. One major development is its agreement to support Anthropic with up to $42 billion in financing for AI computing infrastructure, strengthening Broadcom’s position in the rapidly growing custom-chip and AI infrastructure market. 

    Broadcom is also being closely watched ahead of TSMC’s October 15 results, which could provide further clues about AI chip demand and the semiconductor supply chain. 

    Overall, Broadcom’s AI business remains an important growth story, while investors continue to watch valuation, customer concentration and broader semiconductor-market conditions.

    2025.03.11 ~ 2026.10.06 All orders
    Cumulative P/L0.44 (USD)+6%
    2025.03.112026.10.06
    Trade Showcase: Trade, Show & Earn Rewards!