---
type: "Topics"
locale: "en"
url: "https://longbridge.com/en/topics/100000000786022.md"
description: "Goldman Sachs: Optical Networking &gt; Driven by an AI infrastructure ramp-up and rising computing power per rack, Goldman Sachs forecasts a 9x expansion in the total addressable market (TAM) from US$15bn (GB300 NVL72, mainly in 2026) to US$154bn (Rubin Ultra NVL576, mainly in 2028).&gt; CPO is projected to contribute US$91bn, capturing 59% of the overall US$154bn TAM (assuming a 29% penetration rate in scale-out).&gt; Aggregate networking dollar content per computing unit across scale-up and scale-out is expected to surge 29x, jumping from US$315k in the GB300 NVL72 to US$9.4bn in the Rubin Ultra NVL576. Per computing unit, dollar content increases by 16x in Scale-Out and 45x in Scale-Up.&gt; The addressable market for optical modules/engines expands 13x when moving from scale-out to scale-up architectures.Pluggable Optical Modules &amp; Silicon Photonics (SiPh)&gt; The value market for pluggable optical modules in scale-out will grow 10x per computing unit from the 2H25 server model to the 2H27 server model.&gt; Equivalent 1.6T units per computing unit will skyrocket from 216 units (GB300 NVL72) to 2.5k units (Rubin Ultra NVL576).&gt; Silicon Photonics adoption in the datacom market is expected to spike from 6% in 1Q24 to 45% by 4Q28, offering up to a 32% BoM cost advantage and 20% price advantage over traditional EML solutions at 1.6T speeds.Technology Matrix &amp; Supply Chain Realities&gt; Copper cables and PCBs remain king for short-distance, cost-effective, and low-power connections, but optics become essential for high-speed, long-distance interconnections.&gt; Light source supply (both EML and CW lasers) is expected to remain very tight through 2026/2027 due to booming AI demand and Indium Phosphide (InP) substrate export controls from China. Supply balance isn't expected until 2H28 as supply chain expansions come online.&gt; Alternative entirely optical signal switches (like Google's Palomar OCS) are scaling rapidly, enabling datacenter speed upgrades without needing to replace the switches themselves. Lumentum’s OCS backlog crossed $400M as of Feb 2026.This is a report from April which is made publicly online by GS, but I don't think people covered it enough. Hence, revisiting and highlighting key data potentially missed."
datetime: "2026-07-10T02:02:11.000Z"
locales:
  - [en](https://longbridge.com/en/topics/100000000786022.md)
  - [zh-CN](https://longbridge.com/zh-CN/topics/100000000786022.md)
  - [zh-HK](https://longbridge.com/zh-HK/topics/100000000786022.md)
author: "[Equity research](https://longbridge.com/en/profiles/2071818324550963200.md)"
generator: "portal-rs"
---

# Goldman Sachs: Optical Networking &gt; Driven by a…


### Related Stocks

- [GOOG.US](https://longbridge.com/en/quote/GOOG.US.md)
- [GOOGL.US](https://longbridge.com/en/quote/GOOGL.US.md)
- [GGLS.US](https://longbridge.com/en/quote/GGLS.US.md)
- [GGLL.US](https://longbridge.com/en/quote/GGLL.US.md)
- [GOOGN.US](https://longbridge.com/en/quote/GOOGN.US.md)
- [GS.US](https://longbridge.com/en/quote/GS.US.md)
- [LITE.US](https://longbridge.com/en/quote/LITE.US.md)
- [W4VR.SG](https://longbridge.com/en/quote/W4VR.SG.md)

---
> **Disclaimer: This article is for reference only and does not constitute any investment advice.**