--- title: "中国的上能电气在阿尔巴尼亚安装了一座 24 兆瓦的电池设施" type: "News" locale: "zh-CN" url: "https://longbridge.com/zh-CN/news/282704905.md" description: "来自中国的上能电气在阿尔巴尼亚费尔县成功安装了一套 24 兆瓦的电池储能系统,标志着该国首个电网规模的电池系统。该设施目前已投入商业运营,配备了 4 兆瓦的中央电力转换系统,是阿尔巴尼亚日益增长的可再生能源基础设施的一部分。上能电气此前为西巴尔干地区最大的光伏电站——卡拉瓦斯塔光伏电站提供了逆变器。此项发展紧随该地区其他重要能源项目,包括 Fortis Energy 的 75 兆瓦太阳能发电厂" datetime: "2026-04-14T13:57:23.000Z" locales: - [zh-CN](https://longbridge.com/zh-CN/news/282704905.md) - [en](https://longbridge.com/en/news/282704905.md) - [zh-HK](https://longbridge.com/zh-HK/news/282704905.md) --- # 中国的上能电气在阿尔巴尼亚安装了一座 24 兆瓦的电池设施 ## Sineng Electric, headquartered in Wuxi, China, said it has powered a battery energy storage system (BESS) of 24 MW, with a two-hour duration, in western Albania. The facility is in commercial operation. Albania apparently got its first grid-scale battery system, after YESS Power completed the first one in the Western Balkan region, in neighboring North Macedonia. Sineng Electric revealed that it has powered a 24 MW / 48 MWh facility, featuring its 4 MW “central PCS MV turnkey station,” but without naming the client or any partners. It means that the company supplied a power conversion system and medium-voltage gear. The location is in Fier county, Albania’s photovoltaics hub in the western part of the country. According to the announcement, the BESS is in commercial operation. Sineng Electric is based in Wuxi, west of Shanghai, in Jiangsu province. Its turnkey system consists of two modular 2 MW units titled EH-2000-HA-UD, a transformer and a ring main unit – RMU. The power electronics contractor, founded in 2012, installed the inverters for the Karavasta PV plant, which is also in Fier. The facility is the biggest of its kind in the Western Balkans. > Sineng Electric has supplied and installed the inverters for Karavasta, the largest PV plant in the Western Balkans Notably, late last year, Fortis Energy declared the start of construction of its solar power plant Ersekë of 75 MW in Albania, and said the facility would be integrated with a 25 MWh battery system. Energy Vault Holdings said earlier that it signed a deal with EU Green Energy, a developer active in the Balkans, to deploy 1.8 GWh in BESS capacity. Their strategic partnership involves the latter’s initiatives in Albania, Kosovo\*, North Macedonia, and Montenegro. The first project in Albania, for 100 MW in operating power and a four-hour durability, translating to 400 MWh. The site is in Kullurica in the country’s south, where the first half would to come online in the third quarter, the companies said. They expressed hope that phase 2 would be through in the first quarter of 2027. Post Views: 72 ##### _\* This designation is without prejudice to positions on_ _status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence._ ### 相关股票 - [300827.CN](https://longbridge.com/zh-CN/quote/300827.CN.md) - [159611.CN](https://longbridge.com/zh-CN/quote/159611.CN.md) - [562550.CN](https://longbridge.com/zh-CN/quote/562550.CN.md) - [561700.CN](https://longbridge.com/zh-CN/quote/561700.CN.md) - [560190.CN](https://longbridge.com/zh-CN/quote/560190.CN.md) - [588830.CN](https://longbridge.com/zh-CN/quote/588830.CN.md) ## 相关资讯与研究 - [多用户绿电直连政策出台,不再经过公共电网,绿电直连能终结出口企业的 “碳焦虑” 吗?](https://longbridge.com/zh-CN/news/287153211.md) - [江苏神通(002438):中标中天合创能源有限责任公司采购项目,中标金额为 171.90 万元](https://longbridge.com/zh-CN/news/287189716.md) - [电芯一样,为啥电池安全差别巨大?](https://longbridge.com/zh-CN/news/286522906.md) - [深化氢能产业拓展!国家能源集团与怀柔实验室举行工作会谈](https://longbridge.com/zh-CN/news/287013794.md) - [2026 CIBF 观察:电池行业告别 “产能过剩”,上游资源迎来新棋局](https://longbridge.com/zh-CN/news/287172851.md)