---
title: "EVN 马其顿在其太阳能公园启用了 10 兆瓦的电池储能系统"
type: "News"
locale: "zh-CN"
url: "https://longbridge.com/zh-CN/news/286582695.md"
description: "EVN Macedonia 在其 Probištip 太阳能公园推出了一套 10 兆瓦的电池储能系统（BESS），这标志着它成为北马其顿最大的持牌电池储能系统。该系统的容量为 20 兆瓦时，将增强能源的稳定性和效率。计划将其容量扩大至 40 兆瓦时。该电池储能系统采用宁德时代的磷酸铁锂单元，预计使用寿命为十年。启动活动吸引了多位官员和利益相关者出席"
datetime: "2026-05-15T14:32:19.000Z"
locales:
  - [zh-CN](https://longbridge.com/zh-CN/news/286582695.md)
  - [en](https://longbridge.com/en/news/286582695.md)
  - [zh-HK](https://longbridge.com/zh-HK/news/286582695.md)
---

# EVN 马其顿在其太阳能公园启用了 10 兆瓦的电池储能系统

## EVN Macedonia commissioned a battery energy storage system within its Probištip photovoltaic plant in North Macedonia. With 10 MW in operating power and a 20 MWh capacity, it is the largest in the group and the biggest licensed BESS in the country, according to the company. Installation works are already underway to double its size.

North Macedonia’s power distribution system operator (DSO) EVN Macedonia, which also generates electricity, inaugurated a battery energy storage system co-located with a PV plant in the country’s northeast. It will enable storing the energy produced during the day, to be used at the most favorable time, contributing to stability, flexibility and efficiency of the energy system, the company said.

The BESS in Probištip has a 10 MW capability and a duration of two hours, translating to 20 MWh. It is the largest within the Austria-based EVN Group as well as the largest licensed battery facility in North Macedonia, the announcement reads.

Earlier, Turkish contractor YESS Power completed a BESS of 30 MW and 60 MWh at its client Mey Energy’s solar power plant in Novaci. It is set to enter commercial operation in the third quarter, according to the latest update.

Fortis Energy has a similar project in the same country. It is planning a large photovoltaic system with BESS in Serbia, too, while already building one in neighboring Albania. Another hybrid facility is under construction in North Macedonia, alongside a battery system that complements an existing PV plant. The first grid-scale battery system in Albania recently came online. The other projects in the Western Balkans are still in earlier stages.

> CATL and K Star supplied the equipment

EVN Macedonia started production at the solar park, of 10.9 MW in peak capacity, more than two years ago.

Board members, managers of subsidiaries, officials from the Municipality of Probištip, university professors and representatives of Intebako, the contractor, attended the launch ceremony.

“Soon, the system’s capacity will be doubled to 40 MWh. The equipment for it has already been delivered and is currently in the installation phase,” Chairman of the Management Board Wolfgang Maier stated.

The BESS consists of CATL’s lithium-iron-phosphate (LiFePO4 or LFP) units. It is envisaged to last ten years or 10,000 cycles. The containers with batteries and K Star power conversion systems (PCS) span 580 square meters. The facility received a license on April 9.

Post Views: 61

### 相关股票

- [03750.HK](https://longbridge.com/zh-CN/quote/03750.HK.md)
- [300750.CN](https://longbridge.com/zh-CN/quote/300750.CN.md)
- [002518.CN](https://longbridge.com/zh-CN/quote/002518.CN.md)
- [HCCD.SG](https://longbridge.com/zh-CN/quote/HCCD.SG.md)

## 相关资讯与研究

- [64 亿元入局！宁德时代切入 AI 算力腹地，世纪互联引爆资本预期，突围之路几何？](https://longbridge.com/zh-CN/news/286508793.md)
- [第三次上市失败！海辰储能 “黑马” 变 “病马”？](https://longbridge.com/zh-CN/news/286433477.md)
- [电芯一样，为啥电池安全差别巨大？](https://longbridge.com/zh-CN/news/286522906.md)
- [日均赚超 2 亿！宁德时代的 “躺赢”，根本不是躺平](https://longbridge.com/zh-CN/news/285827235.md)
- [贝莱德增持宁德时代 278.27 万股 每股作价约 667.74 港元](https://longbridge.com/zh-CN/news/286087069.md)