--- title: "中國的上能電氣在阿爾巴尼亞安裝了一座 24 兆瓦的電池設施" type: "News" locale: "zh-HK" url: "https://longbridge.com/zh-HK/news/282704905.md" description: "來自中國的上能電氣在阿爾巴尼亞費爾縣成功安裝了一套 24 兆瓦的電池儲能系統,標誌着該國首個電網規模的電池系統。該設施目前已投入商業運營,配備了 4 兆瓦的中央電力轉換系統,是阿爾巴尼亞日益增長的可再生能源基礎設施的一部分。上能電氣此前為西巴爾幹地區最大的光伏電站——卡拉瓦斯塔光伏電站提供了逆變器。此項發展緊隨該地區其他重要能源項目,包括 Fortis Energy 的 75 兆瓦太陽能發電廠" datetime: "2026-04-14T13:57:23.000Z" locales: - [zh-CN](https://longbridge.com/zh-CN/news/282704905.md) - [en](https://longbridge.com/en/news/282704905.md) - [zh-HK](https://longbridge.com/zh-HK/news/282704905.md) --- # 中國的上能電氣在阿爾巴尼亞安裝了一座 24 兆瓦的電池設施 ## Sineng Electric, headquartered in Wuxi, China, said it has powered a battery energy storage system (BESS) of 24 MW, with a two-hour duration, in western Albania. The facility is in commercial operation. Albania apparently got its first grid-scale battery system, after YESS Power completed the first one in the Western Balkan region, in neighboring North Macedonia. Sineng Electric revealed that it has powered a 24 MW / 48 MWh facility, featuring its 4 MW “central PCS MV turnkey station,” but without naming the client or any partners. It means that the company supplied a power conversion system and medium-voltage gear. The location is in Fier county, Albania’s photovoltaics hub in the western part of the country. According to the announcement, the BESS is in commercial operation. Sineng Electric is based in Wuxi, west of Shanghai, in Jiangsu province. Its turnkey system consists of two modular 2 MW units titled EH-2000-HA-UD, a transformer and a ring main unit – RMU. The power electronics contractor, founded in 2012, installed the inverters for the Karavasta PV plant, which is also in Fier. The facility is the biggest of its kind in the Western Balkans. > Sineng Electric has supplied and installed the inverters for Karavasta, the largest PV plant in the Western Balkans Notably, late last year, Fortis Energy declared the start of construction of its solar power plant Ersekë of 75 MW in Albania, and said the facility would be integrated with a 25 MWh battery system. Energy Vault Holdings said earlier that it signed a deal with EU Green Energy, a developer active in the Balkans, to deploy 1.8 GWh in BESS capacity. Their strategic partnership involves the latter’s initiatives in Albania, Kosovo\*, North Macedonia, and Montenegro. The first project in Albania, for 100 MW in operating power and a four-hour durability, translating to 400 MWh. The site is in Kullurica in the country’s south, where the first half would to come online in the third quarter, the companies said. They expressed hope that phase 2 would be through in the first quarter of 2027. Post Views: 72 ##### _\* This designation is without prejudice to positions on_ _status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence._ ### 相關股票 - [300827.CN](https://longbridge.com/zh-HK/quote/300827.CN.md) - [159611.CN](https://longbridge.com/zh-HK/quote/159611.CN.md) - [562550.CN](https://longbridge.com/zh-HK/quote/562550.CN.md) - [561700.CN](https://longbridge.com/zh-HK/quote/561700.CN.md) - [560190.CN](https://longbridge.com/zh-HK/quote/560190.CN.md) - [588830.CN](https://longbridge.com/zh-HK/quote/588830.CN.md) ## 相關資訊與研究 - [煤氣夥屹創新能源應用「水系金屬電池」壽命達鋰電池 5 倍 用於江蘇巴士充電站](https://longbridge.com/zh-HK/news/286443400.md) - [長建:出售英國電力業務會否派特別息由各成員公司決定,無急切性出售其他資產](https://longbridge.com/zh-HK/news/287059003.md) - [中電源動與鷹君簽 MOU 推物業節能改造](https://longbridge.com/zh-HK/news/286756348.md) - [大唐新能源 4 月發電量 294 萬兆瓦時,跌 12%,4 個月累計發電量跌 10%](https://longbridge.com/zh-HK/news/286833703.md) - [電芯一樣,為啥電池安全差別巨大?](https://longbridge.com/zh-HK/news/286522906.md)