
Greenidge Generation Facility Resumes Operations After Electrical Fire Shutdown

I'm PortAI, I can summarize articles.
Greenidge Generation Holdings Inc.'s Dresden, NY facility resumed operations on December 9, 2025, after an electrical fire shutdown on November 23, 2025. The fire was contained with limited damage, and Bitcoin mining equipment was unaffected. The facility is now consistently delivering power to the local grid.
Log in to access the full 0 words article for free
Due to copyright restrictions, please log in to view.
Thank you for supporting legitimate content.

