
GHPC has put 121 new energy transport loading vehicles into use
Yunnan Construction Investment Concrete (01847.HK) announced the latest situation regarding the construction and operation of its new energy system. The group has built its first comprehensive energy station for heavy trucks at the green production base located in Kunming, Yunnan Province, and has constructed a distributed photovoltaic power station, which will begin grid connection sales in 2024. At the same time, the group has continuously introduced green new energy vehicles such as pure electric loaders, pure electric mixers, and pure electric aggregate transport vehicles in Kunming, Yuxi, Baoshan, and other locations. To date, the group has a total of 121 new energy transportation and loading vehicles, all of which are in operation

