
Galiano Gold Reports High-Grade Drilling Results at Abore Underground Project

Galiano Gold Inc. announced high-grade drilling results at the Abore Underground Project in Ghana, with intercepts of 4.7 g/t gold over 28 meters and 3.5 g/t over 17 meters. The 2025 drilling program has been expanded by 11,000 meters. These results will be included in a maiden underground mineral resource estimate.
Galiano Gold Inc. has announced significant progress in its 2025 Abore drilling program at the Asanko Gold Mine in Ghana, West Africa. The company reported multiple high-grade gold intercepts, including 4.7 grams per tonne (g/t) of gold over 28 meters and 3.5 g/t over 17 meters. These results confirm the continuity of mineralization in newly identified ore shoots located below existing mineral reserves and resources. Encouraged by the continued drilling success, Galiano has expanded the 2025 drilling program by an additional 11,000 meters, with the new high-grade results set to be included in a maiden underground mineral resource estimate. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Galiano Gold Inc. published the original content used to generate this news brief via Newsfile (Ref. ID: 274733) on November 17, 2025, and is solely responsible for the information contained therein. © Copyright 2025 - Public Technologies (PUBT)

