Q2 FY2026 EarningsQ2 FY2026 performance was largely in-line with consensus on the bottom line, despite the lack of revenue as a pre-production mining entity. Net loss of $8.35M slightly missed the $6.70M consensus loss, primarily due to accelerated spending on metallurgical studies and support costs. Diluted EPS (GAAP) of -$0.06 was essentially in-line with the -$0.06 consensus mean. With a significantly bolstered cash position of $99.3M following a $71.7M public offering, the company maintains sufficient liquidity to advance the Richmond Hill Project through feasibility and permitting.