Texas Instruments’ second Melaka assembly and test plant assembles and tests one billion chips in its first year
Summary
Texas Instruments said its second Melaka assembly/test plant, TIEM2, assembled and tested 1 billion chips in its first year after opening in November 2025, with capacity six times the first site and a 2030 goal of 90% in-house assembly/test TechNode.
Impact Analysis
So basically this is TI telling the market it can absorb more volume while keeping supply-chain control. The 1bn-chip TIEM2 milestone isn’t just a plant update; it’s evidence that TI’s in-house assembly/test build-out is working, with capacity six times the first Melaka site and a 2030 target of 90% internalized TechNode+ 3. The timing matters: amid chip-stock weakness and tighter US export controls on Malaysia, TI is projecting operational confidence rather than compliance anxiety Reuters+ 2. The interesting part isn’t the headline, it’s the mix—TI’s analog/embedded chips ride data-center, industrial and auto demand, so it gets AI-infrastructure upside without Nvidia-style cost scrutiny TechNode. Cantor’s upgrade to 385 supports the thesis, but the risk is softer analog demand or competitors adding capacity eroding TI’s pricing power TradingView+ 2. I’d read this as a relative long: own TI for margin durability, watch Melaka regulatory friction.
