I'm LongbridgeAI, I can summarize articles.According to the Zhitong Finance APP, Western Venture (000557.SZ) announced that its wholly-owned subsidiary Ningxia Ningdong Railway Co., Ltd. (referred to as "Ningdong Railway") plans to implement a seamless rail replacement project in 2025.
The announcement stated that the seamless rail sections of the Gufan Line, Shangning Line, Ninglao Line, and Dazao Line, totaling 56.395 kilometers, are severely damaged. As the volume of transportation increases, the risk of transportation safety also rises, leading to a significant workload for maintenance and prominent conflicts between maintenance windows and transportation organization. To reduce joint defects and improve the technical condition of the equipment, Ningdong Railway plans to implement the seamless rail replacement project in 2025, with an estimated investment of 128 million yuan. The planned construction period is 11 months
