longbridgelongbridge
  • Platform Features
    Features
    Investment ProductsPrivate Wealth ManagementTrading ToolsMarket Data ServicesAnalysis ToolsNews ServicesFor Developers
    Account Types
    For IndividualsFor Institutions
  • Café
longbridge
© 2026 Longbridge|Terms of ServicePrivacy Policy

Tesla isn’t joking about building Optimus at an industrial scale: Here we go

Teslarati
Apr 22, 2026 at 10:33 PM
LongbridgeAII'm LongbridgeAI, I can summarize articles.

Tesla is advancing its Optimus robot production with a new factory in Texas, aiming for 10 million units annually. The facility will expand by over 5.2 million square feet, with a construction budget of $5 to $10 billion. Initial production lines at Fremont target one million robots per year. The Texas site will also support AI and chip fabrication projects, enhancing efficiency. Elon Musk anticipates a public release of Optimus by 2027, with a projected price of $20,000 to $30,000, and sees a global demand exceeding 20 billion units.

Tesla’s Q1 2026 Update Letter, released today, confirms that first generation Optimus production lines are now well underway at its Fremont, California factory, with a pilot line targeting one million robots per year to start. Of bigger note is a shared aerial image of a large piece of land adjacent to Gigafactory Texas, that Tesla has prominently labeled “Optimus factory site preparation.”

Permit documents show Tesla is seeking to add over 5.2 million square feet of new building space to the Giga Texas North Campus by the end of 2026, at an estimated construction investment of $5 billion to $10 billion. The longer term production target for that facility is 10 million Optimus units per year. Giga Texas already sits on 2,500 acres with over 10 million square feet of existing factory floor, and the North Campus expansion is being built to support multiple projects, including the dedicated Optimus factory, the Terafab chip fabrication facility (a joint Tesla/SpaceX/xAI venture), a Cybercab test track, road infrastructure, and supporting facilities.

Credit: TESLA

Texas makes strategic sense beyond the existing infrastructure. The state’s tax structure, lower labor costs relative to California, and the proximity to Tesla’s AI training cluster Cortex 1 and 2, both located at Giga Texas and now totaling over 230,000 H100 equivalent GPUs, means the Optimus software stack and the factory producing the hardware will share the same campus. Tesla’s Q1 report also confirmed completion of the AI5 chip tape out in April, the inference processor designed specifically to power Optimus units in the field.

As Teslarati reported, the Texas facility is intended to house Optimus V4 production at full scale. Musk told the World Economic Forum in January that Tesla plans to sell Optimus to the public by end of 2027 at a price between $20,000 and $30,000, stating, “I think everyone on earth is going to have one and want one.” He has previously pegged long term demand for general purpose humanoid robots at over 20 billion units globally, citing both consumer and industrial use cases.

The post Tesla isn’t joking about building Optimus at an industrial scale: Here we go appeared first on TESLARATI.

Login to unlock1,710characters for free

Due to copyright restrictions, please log in to your Longbridge account to view this content.
Thank you for your understanding and support of licensed content.

Related Stocks

Tesla

Tesla

USTSLA

-1.54%

GraniteShares 1.25 Long TSLA Daily ETF

GraniteShares 1.25 Long TSLA Daily ETF

USTSL

-2.01%

Leverage Shares 2X Long TSLA Daily ETF

Leverage Shares 2X Long TSLA Daily ETF

USTSLG

LongbridgeAI