Tesla unveils 7.4 MW Powercore to take on ex-exec Baglino’s Heron Link
Electrek·
- Tesla has unveiled the Powercore, a 7.4 MW solid-state medium-voltage transformer that integrates inverter and breaker functions in a single unit.
- The American-made unit is scheduled to start operating in 2027 and provides grid-forming support up to 10 MVA of peak power.
- The launch coincides with the 2027 production plans for the Heron Link, a competing solid-state transformer by former Tesla executive Drew Baglino's startup, Heron Power.
